Question
In case of concrete pavement, why is requirement of 95% by mass of quartz grains are specified in contract?
Answer In universal Specification of Civil Engineering, in Clause 10.09 it states "Fine aggregate for concrete shall be usual river-deposited sand consisting of at least 95 percent by mass of quartz grains". Aim of such requirement is to control excellence of river sand. As quartz is a strong and hard material, using a far above the ground percentage of quartz in aggregates of concrete is able to enhance strength and durability of surface texture of concrete carriageway.
In adding, such specification needs a high percentage of quartz content, thereby dropping the probability of being there of impurities as shell.
I need to find support reactions at O for the beam with a distributed load, a 6 kN moment couple at A and a 3 kN axial load as shown in picture.
important considerations in case of doors and windows
Define Cleanliness of Surface - Limitations of Ultrasonic System? Sound energy transmission is greatly affected by marine growth on the surface of the concrete element. Ultraso
1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft. The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c
expain
A contractor purchased a Caterpillar D-13 dozer for $100,000 and owned it for five years. The annual cost for maintenance and repair is provided in the Table. With annual interest
a) What are the laws governing compaction of (i) cohesion less soils like sand and (ii) moderately cohesive soils like sandy clay ? b) To what compaction pressure does the
Example for Productivity Analysis and Improvement An excavator with a bucket capacity of 3-yd 3 has a standard production rate of 2,160-yd 3 for an 8-hour day. The job site
measurement of gauge box for sand ?
The regulations and specifications that followed for compaction works for earth dam in Oman
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd