Compute the degree of saturation, Civil Engineering

Assignment Help:

The maximum dry density and optimum moisture content of a soil from standard proctor's test are 18 kN/m3 and 16% respectively.

Compute the degree of saturation of the sample, suppose the specific gravity of soil grains as 2.70.

 


Related Discussions:- Compute the degree of saturation

Concrete technology, material for formwork and their specifications

material for formwork and their specifications

Lubrication of rail joint, Lubrication of rail joints is one of the importa...

Lubrication of rail joints is one of the important items of permanent way works incidental to systematic track maintenance, the lubrication of joints is done for the following purp

Temporary repairs to rail fracture, Q. Temporary Repairs to rail fracture? ...

Q. Temporary Repairs to rail fracture? If a welding party is not readily available, the fracture shall be repaired by using a cut-rail (not less than 4 meter long) and clamped/

Foundation, why is the foundation failure?

why is the foundation failure?

Compute the ultimate settlement, A 2 m wide strip footing is to be constru...

A 2 m wide strip footing is to be constructed in a sandy stratum of 2 m thick. The depth of the footing is 1 m below ground surface. The sand layer is underlain by lm thick cla

Cement bag question., composition of cement in cover bag should be written ...

composition of cement in cover bag should be written or not/ If written which country uses ?please specify the name ?

Chemical deterioration - underwater inspection of bridge, Define Chemical D...

Define Chemical Deterioration - Underwater inspection of Bridge? Chemical deterioration may occur in concrete, which has not been properly compacted, or through environmental p

Concrete structure, which section is most effective for a design of beam an...

which section is most effective for a design of beam and why

Define the term - post-tensioned concret, Define the term - post-tensioned ...

Define the term - post-tensioned concret In the Prescon and B.B.R.V. systems button heads are created at the ends of tendons. In the case of Prescon system, 2 to 130 tendon wir

Calculate the initial height of the stockpile, On a 5-acre level terrain bu...

On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd