In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compaction. The use of vibrating devices such as poker vibrators is rarely adopted for the compaction of concrete piles. As a matter of fact, other than the consideration of the impracticality in using vibrating device in long piles, there is serious concern about possible occurrence of aggregate interlock that poses difficulty at the time of casing extraction. In the worst scenarios, temporary casings together with reinforcement cages are extracted at the time of the lifting up of pile casings. This is another reason that accounts for not using vibrating machines for piles with casing extraction.


Related Discussions:- Compaction to freshly placed concrete piles

Higway engineering, Ask question Design the pavement by group index method ...

Ask question Design the pavement by group index method for heavy traffic using following subgrade data Soil passing 75micron sieve =65%,liquid limit =40%plastic limit =20% #Min

Define recommendations for design of ptfe sliding bearing, Define Recommend...

Define Recommendations for Design of PTFE Sliding Bearing? Other Recommendations for Design of PTFE Sliding Bearing 1. Expansion bearings having sliding surfaces of PTFE sha

Impact of possible energy, a) Take into consideration the boiler efficiency...

a) Take into consideration the boiler efficiency, and verify the cost of heating the building, during the heating season, using present oil and gas prices.  b) Investigate the i

Testing of aggregates, Testing of Aggregates: For use in pavement, ro...

Testing of Aggregates: For use in pavement, road aggregates have to be strong, durable and of good shape. A well-graded aggregates adds to the stability of the layer. The fol

Define the influence line-beam shear, Define the Influence line-beam shear?...

Define the Influence line-beam shear?   1.  Replace point of interest with a link element of nominal length.  If the point of interest is a reaction, place a hinge at that poin

Maintenance of drainage and shoulders, Maintenance of Drainage: Maint...

Maintenance of Drainage: Maintenance of drainage will ensure that the run-off is taken away from the runway efficiently. The side ditches and buried pipes should be cleaned r

Survey, Methods of orientation,Principles of resection

Methods of orientation,Principles of resection

To make open sqare &rectangular, how to calculate the section weight for op...

how to calculate the section weight for open square tube

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd