Compaction to freshly placed concrete piles, Civil Engineering

Assignment Help:

Compaction to freshly placed concrete piles 

In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compaction. The use of vibrating devices such as poker vibrators is rarely adopted for the compaction of concrete piles. As a matter of fact, other than the consideration of the impracticality in using vibrating device in long piles, there is serious concern about possible occurrence of aggregate interlock that poses difficulty at the time of casing extraction. In the worst scenarios, temporary casings together with reinforcement cages are extracted at the time of the lifting up of pile casings. This is another reason that accounts for not using vibrating machines for piles with casing extraction.


Related Discussions:- Compaction to freshly placed concrete piles

Explain the term - untensioned reinforcement, Explain the term - Untensione...

Explain the term - Untensioned Reinforcement In prestressed concrete construction, use of untensioned reinforcement also has to be made alongwith tendons. This is essential as

Kings of the world, i want to know more about civil engineering

i want to know more about civil engineering

Slabs, difference between flat slab and normal slab

difference between flat slab and normal slab

Factors determining the stability of a single armour unit, Q. Factors deter...

Q. Factors determining the stability of a single armour unit There are mostly three major factors that govern the stability of an armour unit, viz gravity, intertangling and s

Advantages associated with this kind of material, Question In pumping s...

Question In pumping stations one of choices for the material of water tanks is fibre-reinforced plastic. What are main advantages associated with this kind of material? An

Optimum moisture content to grab maximum density, Question For compacti...

Question For compaction of free-draining sands or gravels, what is optimum moisture content to grab maximum density ? Answer Compaction curve of dirty materials is com

Convert the azimuth reading of 273.34 to a land bearing, Convert the azimut...

Convert the azimuth reading of 273.34º to a land bearing:  Solution: Convert 273.34º to degrees minutes and seconds = 273º 20' 24" Next, convert the angle to orient to IV

Explain the design discharge for bridge waterway, Q. Explain the Design dis...

Q. Explain the Design discharge for bridge waterway? Design discharge for bridge waterway should be a flood of 50 year frequency. For very large bridges damage to which is like

State the loss of prestress, State the Loss of prestress Loss of prestr...

State the Loss of prestress Loss of prestress due to elastic shortening definitely occurs in pre-tensioned concrete members. But in post-tensioned members it does not occur if

What is a feasibility study, In order to make wise investments in a marketp...

In order to make wise investments in a marketplace experiencing enhancing levels of risk, companies are turning to feasibility studies to verify if they should offer new products,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd