Communication Protocols Applicable in Holonic Manufacturing System
Communication amongst agents plays an essential role in the Holonic manufacturing system. Exchange of information via communication among agents may decrease complexity and uncertainty. The information can generally be classified into two categories. These are procured information and supplied information. The supplied information mentions the data that can be retried from the blackboard or from databases. Alternatively, the procured items are acquired only while an action is initiated via the agents for procuring such information. The given four types of events may be related with an agent (Let Agent A), in the information based manufacturing paradigm:
These four types of event can be tackled via fundamental communication. "Tell and Request" are the two merely communications for inter-agent communication, in Holonic manufacturing system. Based on these two categories of aforementioned and communication four events, protocols are generally classified in to four primary types. The details are specified in Table no.1.
Table no.1: Protocols and Their Significance
Protocol Name and Referencial Mode Number
Types of
Communication
Significance
Tell (mode 1)
Determines, sets, controls etc.,
Mandatory
Negotiate (mode 2)
Discussion, brainstorming sessions, negotiations, etc.
Negotiable
Request (mode 3)
Inquiries, invokes etc.
Can be asked for
(Retrieval)
Disseminate (mode 4)
Proposal, guidance, etc.
Provided voluntarily
(Broadcastable)
parallel force s example
how degree of super heat reduces specific steam consumption
what are the limitations of group technology and life cyle issues in group technology
Value of the maximum shear stress: Illustrates that for a given maximum shear stress the minimum diameter needed for a solid circular shaft to transmit P kW at N rpm may be ex
Q. What is the procedure of hot working? A process is defined as hot working if it takes place when the workpiece is above the recrystallization temperature. Hot Working Ad
Q. What is Shatter test? Shatter test: This test is measure of toughness of the moulding sand. It indicates the capacity of the moulding sand to with stand rough handling dur
Information phase of screw conveyor with auger: Steps: To secure all and complete information and gather facts and from best sources.Our project is selected based on the cu
Permanent Way: Definition In railway engineering, the permanent way refers to the earthen formation and the track structure over it. Gauge The separation
Line Designation Tables (LDT's) (Appendix "D") are initially generated by the Piping designers. Design conditions are inputed by the Process discipline, and the Mechanical Engineer
Dust Collector: Dust collector system is to collect the blast burrs or waste particle created during the blasting process. During the blasting process, this dust co
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd