Common defects - bituminous roads:

Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt.

If an overlay is to be laid on a cracked surface, it is necessary to ensure that the cracks do not travel upwards in the newly laid material. For this purpose, a Stress Absorbing Membrane (SAM) layer or a Stress Absorbing Membrane Interlayer (SAMI) is used. SAM is an application of polymer modified bitumen and covering it with aggregate chips. SAMI is similar to SAM but is followed by an overlay. SAMI can consist of polymer modified bitumen or bitumen impregnated geotextile.

When cracks are extensive, it is preferable to treat the area with a fog seal or slurry seal. The fog seal consists of spraying a bitumen emulsion followed by blinding with graded grit of size 3 mm and lower sizes. A slurry seal is a mixture of fine aggregate, Portland cement filler, bitumen emulsion and additional water, mixed in a mobile mixer and laid to a uniform thickness of 1.5 mm - 5 mm and rolled.

When the surface of the bituminous carpet is loose or has got oxidized, it is necessary to renew the surface by a thin course, consisting of surface dressing, premix carpet, mix- seal surfacing and a semi-dense carpet, depending upon the traffic and importance of the road. The renewal is done once in 3 to 5 years. The renewal helps in restoring the riding quality.

If the surface becomes fatty, a sprinkling of coarse sand or fine chippings and rolling will help.

If the surface becomes very smooth and slippery and has lost its skid-resistance properties, an application of surface dressing can restore its anti-skid properties.


Related Discussions:- Common defects - bituminous roads

Determine the percentage of sand, A certain soil has 99% by weight finer th...

A certain soil has 99% by weight finer than 1 mm, 80% finer than 0.1 mm, 25% finer than 0.01 mm, 8% finer than 0.001 mm. Draw the grain-size distribution curve and determine the pe

Treatment plant - sewer construction, Treatment plant - sewer construction:...

Treatment plant - sewer construction: Problem: How many kg of primary and secondary dry solids needs to be processed daily from the treatment plant? Solution An a

Wrecked trusses and types of damages, Evaluation of various reports regardi...

Evaluation of various reports regarding the effects of earthquake on spatial trusses Types of damages According to the different types of damages, wrecked trusses can be d

leveling, what are the diff.types of levels used in levlin

what are the diff.types of levels used in levling

Mechanism of plastic settlement in fresh concrete, Q. Mechanism of plastic ...

Q. Mechanism of plastic settlement in fresh concrete? Within a few hours after placing of fresh concrete, plastic concrete can experience cracking due to occurrence of plastic

Find the settlement at the centre and at edge of the footing, A load of 300...

A load of 3000 kN is being taken by a square column footing. Side of the column is 3 m, footing rests on a silty soil with a Poisson's ratio = 0.3. Modulus of elasticity of the soi

What will be the increase in horizontal thrust, A 9 metre high retaining wa...

A 9 metre high retaining wall retains a soil with the following properties: φ = 36°; γ = 18 kN/m 3 . What will be the enhance in horizontal thrust if the soil slopes up from the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd