Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt.

If an overlay is to be laid on a cracked surface, it is necessary to ensure that the cracks do not travel upwards in the newly laid material. For this purpose, a Stress Absorbing Membrane (SAM) layer or a Stress Absorbing Membrane Interlayer (SAMI) is used. SAM is an application of polymer modified bitumen and covering it with aggregate chips. SAMI is similar to SAM but is followed by an overlay. SAMI can consist of polymer modified bitumen or bitumen impregnated geotextile.

When cracks are extensive, it is preferable to treat the area with a fog seal or slurry seal. The fog seal consists of spraying a bitumen emulsion followed by blinding with graded grit of size 3 mm and lower sizes. A slurry seal is a mixture of fine aggregate, Portland cement filler, bitumen emulsion and additional water, mixed in a mobile mixer and laid to a uniform thickness of 1.5 mm - 5 mm and rolled.

When the surface of the bituminous carpet is loose or has got oxidized, it is necessary to renew the surface by a thin course, consisting of surface dressing, premix carpet, mix- seal surfacing and a semi-dense carpet, depending upon the traffic and importance of the road. The renewal is done once in 3 to 5 years. The renewal helps in restoring the riding quality.

If the surface becomes fatty, a sprinkling of coarse sand or fine chippings and rolling will help.

If the surface becomes very smooth and slippery and has lost its skid-resistance properties, an application of surface dressing can restore its anti-skid properties.


Related Discussions:- Common defects - bituminous roads

Classification of timber based on availability:, Classification Based on Av...

Classification Based on Availability: Forest departments categorized timbers based on the availability as X=Most common. 1415 m 3 or more per year Y=Common. 355 m 3 to 1415

Bearing, convert the following whole circle bearing to QBs... WCB of AB=45 ...

convert the following whole circle bearing to QBs... WCB of AB=45 degree and 30 mintus

Explain equation for change interval, Explain equation for Change Interval ...

Explain equation for Change Interval y = t + v / 2a + 64.4G Where:  y = length of yellow interval (sec)     t = driver perception/reaction time (1.0 sec generally used)

Project costing for Engineering success, Hi I am looking for someone who ca...

Hi I am looking for someone who can help to solve my assignment questions in a subject called project costing and I need him to continue with me until I complete this subject. I a

Measure the cohesion of internal friction of the soil, A cylindrical specim...

A cylindrical specimen of a saturated soil fails under an axial stress 150 kN/m 2 in an unconfined compression test. The failure plane makes an angle of 52° with the horizontal.

Enthalpy, h = u + pv is a combination of properties and hence must also be ...

h = u + pv is a combination of properties and hence must also be a property.  h is the SPECIFIC ENTHALPY in kJ/kg  H = U + pV is the ENTHALPY in kJ

Determine the statement about construction earthwork, Which of the followin...

Which of the following statements about construction earthwork are true: I.  The volume of earth known in its natural state is known as bank-measure; in-situ; in-place; virgin

Airport lighting, Airport Lighting: Lighting of Approach to Runway ...

Airport Lighting: Lighting of Approach to Runway A good system of identification of the runway when landing is to provide six transverse cross-bars of lights placed a

Evlaute width and depth for stable alluvial canals, Q. Evlaute width and de...

Q. Evlaute width and depth for stable alluvial canals? Lacey originally evolved width and depth formulae for stable alluvial canals. These were the following.  P = 4.836 Q 1

Casing has to be left in for mini-piles, Question What are thought in d...

Question What are thought in determining whether casings have to be left in for mini-piles ? Answer Contrary to most of pile design, design of min-piles is controlled

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd