Commercial building, Civil Engineering

Assignment Help:

i) Describe the general significant of energy performance in industrial or commercial buildings.

 ii) Draw the building layout and produce an overall description that will have operational criteria, cubic space, dimensions, exposed surface area, overall structure, utilisation, orientation etc. of the building of your according.


Related Discussions:- Commercial building

Explain about noise absorptive materials, Q. Explain about Noise absorptive...

Q. Explain about Noise absorptive materials? The fundamental mechanism of noise absorptive material is to change the acoustic energy into heat energy. Amount of heat produced i

Computation of settlement, Q. Computation of Settlement? The settlement...

Q. Computation of Settlement? The settlement  in any soil mass under an applied stress is given by s = s i + s c + s s where, S  =  total settlement, S i =  imm

Define alkali aggregate reaction - chemical deterioration, Define Alkali Ag...

Define Alkali Aggregate Reaction - Chemical deterioration? Sometimes high alkali cement reacts with minerals in certain aggregates and forms expansive compounds resulting into

Solid mensuration, If the diameter of the base remains constant, by what fa...

If the diameter of the base remains constant, by what factor should the altitude be multiplied to produce a cone with twice volume as the original

Theories of failure - cases of solids, Theories of Failure - cases of solid...

Theories of Failure - cases of solids: Let us now consider the solid shown in Figure (b). (a)        As the principal stresses are within 260 MPa, the solid is safe ac

Loading and unloading cycles for soil nails, In carrying out pull-out tests...

In carrying out pull-out tests for soil nails, it generally requires the unloading and loading of soil nails of several cycles up to 80% of ultimate tensile strength of soil nails.

Show the filter below the revetment, Q. Show the filter below the revetment...

Q. Show the filter below the revetment? A filter placed between the revetment / protection works at the surface and the soil bed below the revetment / protection works. Main fu

Calculate the total cost for the project, The total equipment cost for an a...

The total equipment cost for an addition to a pharmaceutical plant is estimated to be $5,000,000. The percentages provided in the Table represent the average expenditures in other

Fore bearing and back bearing, write a c program to calculate the included ...

write a c program to calculate the included angles for given fore bearing and back bearing.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd