i) Describe the general significant of energy performance in industrial or commercial buildings.

 ii) Draw the building layout and produce an overall description that will have operational criteria, cubic space, dimensions, exposed surface area, overall structure, utilisation, orientation etc. of the building of your according.


Related Discussions:- Commercial building

Void ratio, a soil sample is 38mm in diameter and 76mm and in its natural c...

a soil sample is 38mm in diameter and 76mm and in its natural condition weighs 168g.when dried completely in an oven weighs 13o.5g.the value of Gs is 2.73.what is the degree of sat

Traditional granular sub-base, Question For rigid pavement, what is rec...

Question For rigid pavement, what is recompense of using lean concrete sub-base instead of traditional granular sub-base? Answer There are some shortcomings of using

State the term- friction in tendon, State the term- friction in tendon ...

State the term- friction in tendon Considerable frictional loss takes place due to friction between the tendon and the material surrounding it, namely the concrete or the sheat

Calculate the deposited amount - construction management, An engineer depos...

An engineer deposits an "X" amount every 6 months for 3 years so that she'll have $10,000 at the end of this period. The interest rate is 5% per year which is rebalanced every 6-mo

Casing has to be left in for mini-piles, Question What are thought in d...

Question What are thought in determining whether casings have to be left in for mini-piles ? Answer Contrary to most of pile design, design of min-piles is controlled

Define friction pendulum bearing, Define Friction Pendulum Bearing? In ...

Define Friction Pendulum Bearing? In friction pendulum bearings, the lateral displacement is permitted at the interface of the bearing element between the superstructure and th

Show the benefits of adopting marine fill, In reclamation involving large v...

In reclamation involving large volumes of fill and tight programme, shall engineers use marine fill or mud extracted from land borrow area as filling material?  There are two

Corrosion protection of lifting anchors in precast concrete, Q. Corrosion p...

Q. Corrosion protection of lifting anchors in precast concrete? Corrosion of lifting anchors in precast concrete units has to be prevented since the corroded lifting units caus

Describe about the baur-leonhardt system, Describe about the Baur-Leonhardt...

Describe about the Baur-Leonhardt system The Baur-Leonhardt system is included in the third type of anchorages which work under the principle of looping tendon wires at the en

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd