Commercial building, Civil Engineering

Assignment Help:

i) Describe the general significant of energy performance in industrial or commercial buildings.

 ii) Draw the building layout and produce an overall description that will have operational criteria, cubic space, dimensions, exposed surface area, overall structure, utilisation, orientation etc. of the building of your according.


Related Discussions:- Commercial building

Testing of aggregates, Testing of Aggregates: For use in pavement, ro...

Testing of Aggregates: For use in pavement, road aggregates have to be strong, durable and of good shape. A well-graded aggregates adds to the stability of the layer. The fol

Timber, charring of timber

charring of timber

PRC, what is the bleeding of concrete?

what is the bleeding of concrete?

Concrete, what are the appropriate methods of concreting

what are the appropriate methods of concreting

Finite element analysis (bridge), I am a final year civil and structural st...

I am a final year civil and structural student and i need your help about my final year project. My Final Year Topic: Finite Element Analysis of a bridge using Sap2000 Aim: Fi

Demonstrate the design of prestressed concrete poles, Demonstrate the Desi...

Demonstrate the Design  of Prestressed concrete poles Prestressed concrete poles are generally designed as members with uniform prestress since they are subjected to bending mo

Calculate the parameters for setting out curve, Q For a curve of 50, apex ...

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p

Concrete structure, which section is most effective for a design of beam an...

which section is most effective for a design of beam and why

Mechanics, in what condition curve s-t curve is concave and convex

in what condition curve s-t curve is concave and convex

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd