i) Describe the general significant of energy performance in industrial or commercial buildings.
ii) Draw the building layout and produce an overall description that will have operational criteria, cubic space, dimensions, exposed surface area, overall structure, utilisation, orientation etc. of the building of your according.
Question In structure of pump troughs for accommodation of screw pumps, what is major construction process to ensure close contact between screw pumps and pump trough ? An
Define the Planning an Underwater Inspection? Planning for underwater inspection is important because of - Unknown factors which may be discovered during the diving - Th
Q. How to design banks? When approach banks are of medium height upto 3 m, the material may be homogeneous. For bigger heights zoned section with impervious core and pervious o
Q. Can you explain Permeable Spurs? A permeable spur may be constructed by driving two or more rows of bally piles with sufficient penetration below riverbed level to provide a
A rectangular foundation, 2 m × 4 m, transmits a uniform pressure of 450 kN/m 2 to the underlying soil. Verify the vertical stress at a depth of 1 metre below the foundation at a
Define the Working of Ground Penetrating Radar? Ground penetrating radars (GPR) and low frequency sound are also used in scour survey. These are good in shallow water but not v
Ask question #Minimum 1Make a detailed list of all constraints and requirements to the bridge design00 words accepted#
A wastewater plant is operating at 10MGD with a suspended solids concentration of 200mg/L. It has 6 clarifiers operating in parallel. Each clarifier is 40 foot in diameter and 10 f
Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on
M/i=e/r=f/y
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd