Q. Define co-ordination number.

Ans.CO-ORDINATION NUMBER: The number of atoms which are directly surrounding a given atom is known as coordination number. Number of atoms which are touched to a given atoms.

Simple Cubic Structure: In the simple cubic structure one atom is on each corner of a unit cell and any corner atom has four nearest neighbours in the same plus two nearest neighbours are exactly above and other exactly below of that corner atom, thus total number of neighbouring atoms are six. Hence co-ordination number is 6 for SC structure.

Body cubic center structure: In this BCC structure there are 8 atoms, one each at the corner of a unit cell and one atom is at the center of the cube. thus for any corner atom of the unit cell, the nearest atoms are the body centered atoms and the corresponding to a corner  atom of the unit cell , there are 8 unit cell in neighbour , which are having 8 body centered atoms.

     Thus co-ordination no. of BCC=8

Face centered cubic: The co-ordination no. of such structure is12.hence the nearest neighbors of any corner atoms are the face centered atoms of surrounding unit cell. Any corner atom has four such atoms in its own plane, four in a plane above it and four in a plane below it thus total no. of neighboring atoms are 12,it means co-ordination no. of FCC is 12.

Hexagonal closed packed: Each atom touches three atoms in the layer below its plane, six atoms in its plan, and three atoms in the layer above. Hence co-ordination no. of this structure is 12.


Related Discussions:- Co-ordination number

Plastic processing methods , Q. Write short note on following :    ...

Q. Write short note on following :             (i) Compression moulding of plastics.             (ii) Injection moulding of plastics.

Providing alternative escape routes, Providing alternative escape routes: ...

Providing alternative escape routes: The first thing to check is if everyone can turn away from the fire and move safely away from it. For this to be the case there will

Matlab, The 3 sum problem: (20 pts.) Provided a 1D array of integers, find ...

The 3 sum problem: (20 pts.) Provided a 1D array of integers, find all combinations of 3 values from this set such that: a+b+c=0 For example, if one were provided with the set [3 1

Engine drains, ENGINE DRAINS. There are two types of drains: • Con...

ENGINE DRAINS. There are two types of drains: • Controlled drains - the result of normal operation. • Uncontrolled drains - the result of abnormal operation. CONTROLLE

Mobile Communication, A car, moving in the south-east direction at a veloci...

A car, moving in the south-east direction at a velocity of 5 m/s, receives a ray of power of -120 dBm each from the north, east and west. The carrier frequency is 300 MHz. (i) Sket

Finance Project, You are interested in proposing a new venture to the manag...

You are interested in proposing a new venture to the management of your company. Pertinent financial information is given below. BALANCE SHEET Cash 2,000,000 Accounts Payable and

Permeability of moulding sand, Permeability of Moulding Sand  is the proper...

Permeability of Moulding Sand  is the property of the sand, which permits the gases and steam to escape through the sand mould. For this purpose, the sand must be porous. Permeabil

Basic instrumentation system, A basic instrumentation system consists of a ...

A basic instrumentation system consists of a transducer, conditioning amplifier, and analog digital converter connected (in general) by analog and digital transmission lines.

Structural, what is covered un this field?

what is covered un this field?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd