Cleaning and greasing of steel sliding bearings, Civil Engineering

Assignment Help:

Cleaning and greasing of steel sliding bearings :

Following equipments are required for greasing of steel sliding bearings:

1. Jacks (50 ton capacity) - 2 nos.

2. Hard wooden packing below and above jack

3. Grease graphite Grade 3 conforming to IS:508

4. Kerosene or released black oil for cleaning

5. 6 mm thick steel scrapers

6. Mortar pan

7. Cotton waste

Greasing of sliding bearings can be undertaken under traffic with issue of caution order and line protection for temporary works as per provision of IRPWM.

Lifting of girder should be restricted to 8 to 10 mm only, ensuring that the bearing strip does not get lifted over locking strip and guide strip to avoid creep of girder in logitudinal and lateral direction. For lifting, it is not necessary to break the track. Only loosening of fish bolts and dog spikes over a small length on both sides of the pier is sufficient. Only one end of the girder should be lifted at a time and steel scraper inserted between bearing strip and base plate to remove old grease dust and dirt. The contact surface is cleaned with oil and grease applied. Girder is then lowered back over the base plate. Time required for all these activities is approximately 15 to 20 minutes.


Related Discussions:- Cleaning and greasing of steel sliding bearings

Explain the toxic characteristics - hazardous waste, Explain the Toxic Char...

Explain the Toxic Characteristics - Hazardous Waste - From the results of either  - Extraction Procedure(EP) toxicity (prior to March 1990) or Toxicity Characteristic Leachi

Total station, describe in detail the various parts of a total station

describe in detail the various parts of a total station

Concrete, types of concrete and its uses

types of concrete and its uses

Alum, Aalumsk question #Minimum 100 words accepted#

Aalumsk question #Minimum 100 words accepted#

Single flemish bond, advantages and disadvantages in single flemish bond

advantages and disadvantages in single flemish bond

Explain national contingency plan (ncp), Explain National Contingency Plan ...

Explain National Contingency Plan (NCP) - Provides detailed direction on the action to be taken at a hazardous waste site, including emergency actions and a method to rank site

Deflection, solving problems with their answer

solving problems with their answer

How to design marginal embankments, Q. How to design Marginal Embankments? ...

Q. How to design Marginal Embankments? Design aspects of marginal embankments are similar to those of approach banks. The aspects needing special attention are dealt with below

Construct the correct network for project, A project requires that activiti...

A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd