Classify the below techniques into dynamic or static.
i. Data Flow Analysis.
ii. Use Case Testing.
iii. Equivalence Partitioning.
iv. Exploratory Testing.
v. Inspections.
vi. Decision Testing.
Static:
i) Inspections
ii.) Data Flow Analysis
Dynamic:
i.) Exploratory Testing
ii.) Use Case Testing,
iii.) Equivalence Partitioning,
iv.) Decision Testing are dynamic
HOW DECISION TREE IS SIMULATED IN PSCAD
Define White box testing White box testing method deals with the internal logic and structure of the code. White box testing also called as glass, structural, branches, paths
Determine the primary activities of spiral model Below are the primary activities in this model: • Finalising Objective: Objectives are set for the particular phase of the
Question : (a) What is embedded system partitioning? What is decided during partitioning? (b) What is the difference between structural and functional partitioning? Which on
A program is to be developed to simulate the operations of a scientific calculator. List the facilities to be provided by this calculator. Analyze this using a DFD 0 - level and 1
Testing conducted to classify a system or component at or beyond the limits of its described requirements.
Sanity testing is performed whenever cursory testing is sufficient to show the application is functioning according to specifications. This level of testing is a subset of regressi
Illustrate exploratory testing. - In exploratory testing approach testers are involved in maximum test execution and minimum planning. - Planning includes creation of a test
What is the Key Process Areas SEI has associated key process areas(KPAs) with every maturity level. KPA is an indicative measurement of goodness of software engineering functi
What are the three activities of risk assessment? The three activities are identifying, examining and giving priorities . Risks can be identified by a check list or looking at
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!