Checking at Site - Testing of Meter

The routine testing of meters should be carried out once in 3 years. Further, surprise checks should be conducted at the consumer's installation and meters should be checked from time to time. The significant points to be paid attention to although checking are given below.

Checklist of Important Points for Checking at Site

i) Connections of meter are proper.

ii) Seals are not tampered with.

iii) No loose or direct connections exist.

iv) Meter is not damaged to record less.

v) CTs are properly linked.  No reversal of any phase connection exists. There are multiplying factor is properly calculated and applied.

vi) Meter is well protected from rain, vermin's and dust etc.

vii) Links are connected.

viii) Terminal block is not damaged.

Along with the help of load current of known magnitude (preferably of resistive type) and a wrist watch having a second's hand, you could off hand check at site the performance of the meter as also its accuracy to a few extent.


Related Discussions:- Checking at site - testing of meter

Clapp oscillator, derivation of frequency of oscillators clapp and derive C...

derivation of frequency of oscillators clapp and derive C effect?

Draw circuit diagrams and show polarity markings, Q. Two single-phase trans...

Q. Two single-phase transformers, each rated 2400: 120-V, are to be interconnected for (a) 4800:240- V operation, and (b) 2400:120-V operation. Draw circuit diagrams and show polar

The potential difference at the battery terminals, Ten 1.5V cells in series...

Ten 1.5V cells in series, each cells having an internal resistance of 0.3Ω, are connected series to a load of 25Ω. Determine : i.The current flowing the circuit

Short-term measures for technical loss reduction, Short-Term Measures for T...

Short-Term Measures for Technical Loss Reduction The short-term measures involve measures needs for immediate improvement and reduction of losses within the system. These are

Unit impulse response of a linear system, Q. The unit impulse response h(t)...

Q. The unit impulse response h(t) of a linear system is h(t) = 5e -t cos(2t - 30°). Determine H(s).

Synchronization, Synchronization:  Whatever type of weep is used, it must ...

Synchronization:  Whatever type of weep is used, it must be synchronized with the signal being measured. Synchronization has to be done to obtain a stationary pattern. This requir

Calculate the power required from power plant, You will develop a simulatio...

You will develop a simulation that will consist of the following five components: Controller: This script component controls the simulation. It shall permit the user to: 1. C

FET operation, ON output plot of a JFET n-channel transistor if ID is close...

ON output plot of a JFET n-channel transistor if ID is close to IDSS does the value of VGS close to VP?

The electrical circuit sign convention, The Electrical Circuit sign convent...

The Electrical Circuit sign convention Notice that current leaves a source at its high potential (positive) terminal but enters a load at its high potential (positive) ter

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd