Characteristics of job order production, Operation Management

Assignment Help:

Characteristics of job order Production

  • Small Production Runs: Job order production is characterized by the manufacturing of one or few numbers of single product designed and manufactured strictly to customer specification.
  • Flow of Materials: The flow of materials and components between different stages of manufacture is highly discontinuous due to imbalanced operation wise work content.
  • Manufacturing Cycle time: Relatively long delays occur at the assembly as well at the material processing stages due to lack of materials or components. Imbalanced work flow design changes design errors detected during manufacturing etc. Moreover at times the time needed to design the special project undertaken exceeds its manufacturing time. All these factors tend to lengthen the manufacturing cycle time.
  • Layout of plant and equipment: The machines are arranged according to process layout. Because the operations and their sequence change form product to product.
  • Skill Required: Highly skilled and versatile workers are necessary. They are expected to do the work independently and display a great deal of initiative and judgment.
  • Quality of Supervision: Highly competent general engineers are usually engaged as supervisors practical men with through training, capable of taking independent change of each contract are employed to work at site. Close supervision is also necessary.
  • Cost of Production: The unit cost of production is high. Since the firm cannot take the advantages of large scale buying and automation.

Related Discussions:- Characteristics of job order production

Explain characterize the bacterial and bacterial-like, Characterize the bac...

Characterize the bacterial and bacterial-like STIs, focusing on infectious agents and manifestations

Explain supervise the work of subject matter experts, Which of the followin...

Which of the following role and attributes do NOT describe the core team members on a project? A. Core team members often make project decisions jointly with the project manager

Determine the order size that will minimize the total cost, You are the Sto...

You are the Stores Manager at the Ministry of Information and you have the responsibility of managing store room No. 101 where all blank papers for this Ministry are kept. The ann

Case an American Tragedy: How a Good Company Died?, Do you think that inade...

Do you think that inadequate strategic planning was a factor that resulted in the company''s asking for trade protection?

Describe under what conditions purchase the new equipment, Assume that you ...

Assume that you are offered a new piece of equipment for $10,000. The equipment will produce 10,000 units per year with a margin of $6.00 per unit. Demand for the product being pro

Cheapest car rental rents cars why getting loses, Cheapest Car Rental rents...

Cheapest Car Rental rents cars at the Chicago airport. The car rental market consists of two segments: the short term segment, which rents for an average of .5 weeks, and the mediu

Explain swot analysis of united airlines, Can you help me with the swot ana...

Can you help me with the swot analysis of united airlines?

Explain modern sweatshops are a problem, 1) List the four schools of though...

1) List the four schools of thought along with the basic cause of the labour problem and solution to the labour problem for each. 2) Explore the online exhibit about the 1911 Tr

Explain cost of a project, illustrate how to effectively and efficiently re...

illustrate how to effectively and efficiently report on the cost of a project to the different stakeholder groups • Use figures and tables to provide examples • Show calculat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd