Cash Conversion Cycle, Finance, Other Engineering

Assignment Help:
The need for working capital to run the day-to-day business activities cannot be overemphasized. We will hardly find a business firm which does not require any amount of working capital, indeed firms differ in their requirements of the working capital.

We know that a firm should aim at maximizing the wealth of its shareholders. In its endeavour to do so, a firm should earn sufficient return from its operations. Earnings a steady amount of profit requires successful sales activity. The firm has to invest enough funds in current assets for generating sales. Current assets are needed because sales do not convert into cash instantaneously. There is always an operating cycle involved in the conversion of sales into cash.

There is a difference between current and fixed assets in terms of their liquidity. A firm requires many years to recover the initial investment in fixed assets such as plant and machinery or land and buildings. On the contrary, investment in current assets such as inventories and debtors (accounts receivable) is realized during the firm’s operating cycle that is usually less than a year what is an operating cycle?

Operating cycle is the time duration required to convert sales, after the conversion of resources inventories, into cash. The operating cycle of a manufacturing company involves three phases:

1. Acquisition of resources such as raw material, labour power and fuel etc.

2. Manufacture of the product which includes conversion of raw material into work-in-progress into finished goods.

3. Sale of the product either for cash or on credit. Credit sales create account receivable for collection.

Related Discussions:- Cash Conversion Cycle, Finance

Legal issues and professional ethics in engineering, Write a detailed repor...

Write a detailed report under the theme "Legal Issues and Professional ethics in Engineering". Some of the topics that you can consider, but not limited to them, are as follow:

Guidance systems , The design and implementation of an autonomous guidance ...

The design and implementation of an autonomous guidance system requires knowledge and an understanding of a wide range of technologies, from the physical dynamics of the vehicle (i

Model independent option valuation , Derive the functional relationship bet...

Derive the functional relationship between the no-arbitrage values of the two vertical spreads, C (K1)-C (K2) and C (K2)-C (K3).

Flow at low mach number and zero incidence about m6 wing, Flow at low Mach ...

Flow at low Mach number and zero incidence about M6 wing Results from FP were obtained corresponding to M ∞ = 0.2 and a = 0 and, as noted, with the input files generated by FP

Governing equations of typical section aerofoil, We recall the "typical sec...

We recall the "typical section" aerofoil model with oscillating pitching and plunging motions to represent the torsional and bending behaviour of a wing structure with large aspect

Time motion study, how to create a chart of time motion study

how to create a chart of time motion study

Air flow control system – operation, Air flow control system – operation: ...

Air flow control system – operation: The stages of the compressor are matched to give the highest efficiency in the speed range maximum rev/min. To extend the range of smooth

1 year engg, state and explain varignons theorem

state and explain varignons theorem

Junction diode summary, The PN junction region of the Junction Diode has ...

The PN junction region of the Junction Diode has the following significant characteristics: Semiconductors contain two types of mobile charge carriers, Electrons and Holes

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd