M/s XYZ Ltd manufactures a product “PLVS” at its plant at Meerut, the maximum capacity of which is 200 units per month. Details of raw materials which go into the making of 1 units of “PLVS” are provided to you below:-
Sl.No Raw material description Standard Qty per finished unit (No) Standard purchase price per unit (Rs. 00)
1 A 1 6
2. B 2 5
3. C 3 4
4. D 4 3
5. E 5 2
6. F 6 1

Standard fixed overheads are Rs. 20,00,000/- per month whereas the standard variable overhead rate has been estimated as equal to Rs.1,400/- per unit of finished good.

You are required to compute the
a) Standard cost of the product.
b) Compute the production volume variance in case the company produces and sells only 100 units of finished goods in the concerned month.
c) Compute the usage and material price variances considering the following actual data (actual production and sale: 100 units)

Related Discussions:- case study

Thermo electric thermometer, how thermoelecteric thermometer is contructed ...

how thermoelecteric thermometer is contructed and how it working

Falling weight impact testing , Drop-weight impact towers are frequently us...

Drop-weight impact towers are frequently used to generate low velocity impact damage. Typically, the falling mass will be instrumented, containing a load-cell for measuring the lo

Commercial buildings - fire protection engineering, Commercial buildings - ...

Commercial buildings - fire protection engineering: The term 'commercial buildings' refers to any buildings that are not residential buildings and that do not fall under the m

Cash flow diagrams, Cash Flow Diagrams We will use a cash flow approac...

Cash Flow Diagrams We will use a cash flow approach to analyze the flow of money through out a planning horizon. A cash flow occurs when money actually change hands. We will u

Oscilloscope probes, Direct probe,isolation probe,high impedence probe,acti...

Direct probe,isolation probe,high impedence probe,active probe,current probe

Fire alarm systems - look for when inspecting, Fire alarm systems: Fir...

Fire alarm systems: Fire alarm systems can be very complex and it is usually not possible for an enforcing officer to check all the cabling, the components, the software and t

Chromizing, advantages and disadvantages

advantages and disadvantages

Signal conditioning amplifier, Signal conditioning amplifier The primar...

Signal conditioning amplifier The primary function of the signal conditioning amplifier is to match the output signal range of the transducer to the input signal range of the a

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd