Q. Can you determine the Quantity of apron stone?

Quantity should be sufficient to cover the scoured face down to maximum depth of scour obtained using scour factor c of 2.5 at upstream curved head and 1.5 for the rest of the length in Lacey formula

813_Quantity of apron stone.png

wherein D is depth of flow below H.F.L. in m, q is discharge intensity in m3/s per metre width within guide bunds on bridge section, f is the silt factor and c the scour factor. It has been observed that the above Lacey formula does not give a good fit for data of some of the rivers. As an alternative, the Laursen formula for guide bund contraction can therefore be applied in the following form to obtain average depth of flow D within guide bunds.


Related Discussions:- Can you determine the quantity of apron stone

WMM, gradation of materials used in wet mix macadam

gradation of materials used in wet mix macadam

What is switch and expansion joint, Q. What is Switch and Expansion Joint? ...

Q. What is Switch and Expansion Joint? Switch Expansion, Joint (SEJ) is an expansion joint installed at each end of LWR/CWR to permit expansion/contraction of the adjoining bre

Fore bearing and back bearing, write a c program to calculate the included ...

write a c program to calculate the included angles for given fore bearing and back bearing.

Lines, find the equation of the line with slope 4 and passing through the p...

find the equation of the line with slope 4 and passing through the point of intersection of the line x+6y-4=0 ad 3x-4y+2=10

Survey chain, describe gunters chain in survey

describe gunters chain in survey

Define shear slump and collapse slump in slump test, Q. Define Shear slump ...

Q. Define Shear slump and collapse slump in slump test? There are three kinds of slump which can take place in a slumps test, namely, true slump, shear slump and collapse slump

Problems in turbid water - underwater inspection of bridge, Define Problems...

Define Problems in turbid water - underwater inspection of bridge? There are three main problems, which limit the viewing performance of an underwater camera. These are: -

Survey, underground installations

underground installations

Theory of structure, whatismeanby shear force and bending moment

whatismeanby shear force and bending moment

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd