Write a program called, A1Q1, that reads a single letter.   It will then display the corresponding ASCII code of the letter and prints the next character and the character which is corresponding to the "ASCII code + 3".  Comment on the unusual behaviour if you enter 'z' or 'Z' or '9' or '@'.  Shorthand operators and increment/decrement operators should be used in your code.

2. Write a program called A1Q2, that calculates the energy needed to heat water from an initial temperature to a final temperature. Your program should prompt the user to enter the volume of water in gallons and the initial and final temperatures in Fahrenheit. The formula to compute the energy isenergy = mass * (temperatureFinal - temperatureInitial ) * 4184 where 'mass' is in Kg; temperatures are in degrees Celsius and  'energy' is in J.  You will need to convert the inputs to the proper units (1 gallon = 3.785 litres).  Use constants not numeric literals to define physical constants and conversion factors.  What happens if the user enters the values as octal or hexadecimal numbers?

Here is a sample run:

Enter the amount of water in gallons: 11.5 

Enter the initial temperature in F: 55.2 

Enter the final temperature in F: 78.5 

To heat the water of 43.5275 kg from 12.8889 C to 25.8333 C, the required energy is 2357.43 KJ.


Related Discussions:- Calculates the energy required

Postensioning in raft foundation, how can we post tension a raft foundation...

how can we post tension a raft foundation? what design procedure should we follow to post tension raft foundation in order to decrease the concrete and steel volume and increase th

Void ratio and dry density of a soil, Q. Define water content, void ratio ...

Q. Define water content, void ratio and dry density of a soil. If wet density of a soil is 1.9 gm per cm at a moisture content of 24%, what will be its dry density?  Ans. - W

Solid mensuration, the base of an isosceles triangle and the altitude is dr...

the base of an isosceles triangle and the altitude is drawn from one of the congruent sides are equal to 18cm and 15cm , respectively . Find the lenghts of the sides of the triangl

Breakwaters - harbour layout, Breakwaters: A breakwater is an artific...

Breakwaters: A breakwater is an artificial structure constructed in the sea to protect ships from the effect of waves and storms. Three types of breakwaters are common :

Method of construction of a bored cast-in-situ concrete pile, Q. Method of ...

Q. Method of construction of a bored cast-in-situ concrete pile? Ans. - Bored cast-in-situ concrete pile - A guide casing of 3 to 4 m length is provided on top of the bore hole

LEVELLING, WHAT IS FLYBBACK LEVELLING

WHAT IS FLYBBACK LEVELLING

Cycle, what is motor cycle. please explain.

what is motor cycle. please explain.

Is cbr test is an arbitrary test, CBR Test is an arbitrary test', justify. ...

CBR Test is an arbitrary test', justify. Explain the procedure for conducting the CBR test in the field. Surcharge loads are used in the CBR test; Describe their significa

Bridge engineering, long span bridge or continuous bridge which is more pre...

long span bridge or continuous bridge which is more preferable and why ??? what is the major problem in continuous bridge and what would be its effect if there is any differential

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd