Calculate the standard time, Mechanical Engineering

Assignment Help:

a) The total estimated time for an operation ie assembly of a pin is 2 minutes. If the rating is 120% determine normal time. If total allowances allowed are 10% for that job, calculate the standard time.

b) Why is it important to maintain time standards? Also mention limitations of time study.


Related Discussions:- Calculate the standard time

Determine shear plane angle, The following data was obtained from an orthog...

The following data was obtained from an orthogonal cutting test : Rake angle = 20o, Depth of cut = 6 mm Feed rate = 025 mm/rev Chip length before cutting = 29.4 mm Chip

Show the corrosion mechanisms, Q. Show the corrosion mechanisms? The fo...

Q. Show the corrosion mechanisms? The following corrosion mechanisms are likely to happen in the Oil Treating Unit: Under Deposit Corrosion and MIC Since cooling e

Determine the eigen values, Determine the eigen values and eigen vectors of...

Determine the eigen values and eigen vectors of the matrix

The linear dimension command, The Linear Dimension Command            ...

The Linear Dimension Command                                    You can use this command to generate horizontal and vertical dimensions.Creating a linear dimension is eas

Define the disadvantages of abrasive jet cutting machines, Define the Disad...

Define the Disadvantages of Abrasive Jet Cutting Machines Slow material removal rate. Stray cutting and hence accuracy is not good. Abrasive powder cannot be reused

Basic formula for maximum bending moment, Q.  W rite down the basic form...

Q.  W rite down the basic formula for maximum bending moment in some ideal cases. Sol.:   Ber m together with nature of load Maximu

Materials, ">http://www.expertsmind.com/questions/the-percentage-elongation...

">http://www.expertsmind.com/questions/the-percentage-elongation-of-the-metal-stress-30138407.aspx

Find the machine fraction for machine operation, 1.Two machining operations...

1.Two machining operations, A (3 minutes per part) and B (10 minutes per part), are performed sequentially to manufacture a part. Machines A and B produce 5% and 6% defective items

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd