Q  A transition curve is required for a circular curve of 200-meter Φ radius, the gauge being 1.5 m. and max super elevation restricted to 15 cm. The transition restricted to 15 cm. The transition is to be designed for a velocity such that no lateral pressure is imposed on the rails and the rate of gain of radial acceleration is 30 cm / sec3 . Calculate the required length of transition. 


Related Discussions:- Calculate the required length of transition

Define pavement design - transportation, Define Pavement Design - Transport...

Define Pavement Design - Transportation 1. Asphalt surface a. Estimate Design Traffic b. Determine the Structural Number (SN) for the given traffic, roadway, and soil cha

Properties of ordinary portland cement, Properties of Ordinary Portland Cem...

Properties of Ordinary Portland Cement (i) Chemical properties: Portland cement consists chemical compounds are following: (a) Tricalcium silicate          3 CaO.SiO 2 (C

#Friction, #Determine the smallest value of P and corresponding angle to th...

#Determine the smallest value of P and corresponding angle to the inclined plane which is inclined by 30 degree to horizontal to just start the block moving up the inclined plane.

Angle&direction, whate does mean bearing?with example

whate does mean bearing?with example

Protection of lorry on the line, i. On single line by one or two men as req...

i. On single line by one or two men as required following and proceeding the lorry at a distance of 600 m. on the BG and 400 m. on the MG & NG carrying a banner flag across the tra

Joints in concrete pavements, Joints in Concrete Pavements: Concrete ...

Joints in Concrete Pavements: Concrete pavements in India are of the jointed plain (unreinforced type). The following types of joints are needed in them : (a) Transverse C

Explain the statements about construction contract process, Explain the Sta...

Explain the Statements about the Construction Contract Process I. Surety bond assures the project owner a guarantee of funds equivalent to a promissory note. The surety bond is

Vertical gradient - geometric design of roads, Vertical Gradient: Ver...

Vertical Gradient: Vertical gradient can be of three types: Ruling Gradient Used as a matter of course. Limiting Gradient Used in situations where site condit

Analyse and evaluate lightning strikes, Carry out research to Analyse and E...

Carry out research to Analyse and Evaluate: a.   The potential problems that lightning strikes to an aircraft in flight could create. b.   How design features and maintenance

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd