Calculate the percent grade of line, Civil Engineering

Assignment Help:

1. The topography of a local valley is shown. The horizontal distance between point P and Q is 11,456-ft. The percent grade (%) of line P-Q .

 

1693_The percent grade of line.jpg

 

2. Based on the information provided in Figure, the elevation of BM2 is most nearly:

602_elevation.png


Related Discussions:- Calculate the percent grade of line

Explain the critical depth, Explain the Critical Depth d c is the dept...

Explain the Critical Depth d c is the depth of flow in an open channel that has the lowest energy.  In rectangular open channels:  (d c ) 3 = Q 2 /g(w) 2 In nonrectang

What is a projection line, Projection line is the way, in which the earth i...

Projection line is the way, in which the earth is made known on a flat piece of paper.

N-type semiconductor is an example of what semiconductor, N-type semiconduc...

N-type semiconductor is an example of what semiconductor? Answer : N-type semiconductor is an example of extrinsic semiconductor.

Project management, Project Management: This unit starts with the gene...

Project Management: This unit starts with the general definition of Project management. Several phases involved in project management are also desribed. Further, the technique

Solubility - Soil compaction, Solubility: Bitumen is soluble in carbo...

Solubility: Bitumen is soluble in carbon disulphide (CS2). The Indian specifications require that the bitumen should have 99 per cent solubility. Lesser value indicates prese

Calculate the diameter of the stockpile, 1. On a 5-acre level terrain build...

1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft su

Define inspection of steel or cast iron substructures, Define Inspection of...

Define Inspection of Steel or Cast Iron Substructures? Corrosion is the principal cause of deterioration in steel waterfront substructures. On bare un-protected steel pilings,

Plumbing technology, This assessment will test Learning Outcomes 3 and 4 as...

This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expect

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd