Calculate the parameters for setting out curve, Civil Engineering

Assignment Help:

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a point 100m from CTP. Make out a dimension sketch showing transition tangent point, curve tangent point, transition length and length of curve.


Related Discussions:- Calculate the parameters for setting out curve

Assignment , A cantilever beam is loaded with a concentrated. Force of 5kN ...

A cantilever beam is loaded with a concentrated. Force of 5kN at the free end. The length of the cantilever beam is 1m having cross section of 50×50mm. determine the equation for b

Water absorption test for precast concrete pipes, Purpose of carrying out w...

Purpose of carrying out water absorption test for precast concrete pipes Cement will mix with more water than is essential to ultimately combine during hydration of cement pas

What is the station at point b, What is the station at Point B? SO...

What is the station at Point B? SOLUTION 3 Station at Point A = Sta 22+45  Station at Point B = (Sta 22+45) + 1028' = 2245'+1028' =3273'  = Sta 32+73

Water treatment, The transmission main from the well field to the community...

The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c

State different types of chlorination processes, Q. State different types o...

Q. State different types of chlorination processes available in Railway & market for disinfect ion of water. What type of chlorine used in the above different process. What do you

Define the arrow diagramming method, Define the Arrow Diagramming Method ...

Define the Arrow Diagramming Method Activity-on-Arrow (Branch) with nodes as dependencies Uses finish-to-start precedence only. The solution method for an activity on

What is admixtures, Q. What is Admixtures? These are the substance whic...

Q. What is Admixtures? These are the substance which are added to the concrete to improve its qualities either its placing or in its subsequent performance. An admixture may be

Define the term - pre- tensioning, Define the term - pre- tensioning It...

Define the term - pre- tensioning It is a method of prestressing in which tendons are placed, inside ducts or passages provided in concrete, after concrete gains sufficient str

Calculate distance between top and bottom chord of the truss, A W12x58 memb...

A W12x58 member, which comprises a vertical member in a truss span, is subjected to a factored axial compressive force of 163 kips.  The W12x58 section is oriented such that the st

Concrete technology, why strength of transition zone is less than bulk past...

why strength of transition zone is less than bulk paste

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd