Calculate the overall fraction defective from all of sample:

ABC insurance company desires to design a control chart to check whether insurance claim forms are being correctly completed. The company intends to utilize the chart to see if improvements in the design of the form are effective. To begin the procedure the company gathered data on the number of incorrect completed forms over the past 10 days. The insurance company processes thousands of these forms each of day, and because of the high cost of inspecting each form, only a small representative sample was gathered each day. The data and analysis are given in Table

Solution                                   

To build the control chart, first calculate the overall fraction defective from all of samples. This sets the centre line for the control chart.

p' =   91 /3000 = 0.03033

After that calculate the sample standard deviation :

854_Calculate the overall fraction defective from all of sample.png

At last calculate the upper and lower control limits. For z = 3, we have

UCL = p' + 3s p  = 0.03033 + 3 (0.00990) = 0.06004

LCL = p' - 3s p  = 0.03033 - 3 (0.00990) = 0.00063

Table: Insurance Company Claim Form

1816_Calculate the overall fraction defective from all of sample1.png


Related Discussions:- Calculate the overall fraction defective from all of sample

Steady state conditions and the thermal equilibrium state, What is a differ...

What is a difference between the steady state conditions and the thermal equilibrium state? In steady state condition, temperatures are constant although heat transfer is taking

Air injection system and solid injection system, (a) Explain a typical fuel...

(a) Explain a typical fuel feed system for a C.I engine, differentiate between air injection system and solid injection system. (b) Why Gasoline injection system has been adopte

Explain the non-linear sweep, Non-linear Sweep In non-linear sweep, the...

Non-linear Sweep In non-linear sweep, the path is a curve described by a higher-order equation (quadratic, cubic or higher)

Principle of submerged arc welding, PRINCIPLE OF SUBMERGED ARC WELDING In...

PRINCIPLE OF SUBMERGED ARC WELDING In submerged arc welding, the arc zone is submerged beneath the molten flux and hence there is no visible signature of the arc. Welding current

What are the various types of wear found in cutting tool, What are the cond...

What are the condition that could allow a continuous chip to be formed in a metal cutting ? How is metal removed in metal cutting? Illustrate the Process with neat sketch. What

Instantaneous center method, Linear velocity of links using Instantaneous c...

Linear velocity of links using Instantaneous center method

Elevator, These are differentiated from hoists by the fact that the opera...

These are differentiated from hoists by the fact that the operator rides with the load. There are many different types of drives for such elevators but in general electric

What is value engineering, Value engineering & Value analysis VA may b...

Value engineering & Value analysis VA may be defined as looking at an existing product or a product already in production to see if changes in design or process can reduce prod

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd