Calculate the Modulus of elasticity of concrete
A pre-stressed concrete beam, having a cross-section of 150 mm width and 400 mm depth, is used over a span of 8 m. Straight tendons. which are having a stress of 1200 N/mm2, are provided with a constant eccentricity of 60 mm. The sectional area of tendons is 120 mm2. What shall be the percentage increase in stress in the wires when the beam supports a live load of 5 kN/m over whole of its span. The density of concrete is 24 kN/ m3. Modulus of elasticity of concrete and steel may be taken as 36 kN/m2 and 210 kN/m2 respectively.
Question What are major differences between sureties and security ? Answer During construction contracts, if a contractor fails to carry out works, employer would e
unit of kinematic viscosity
describe and sketch a survey chain
Soil Classification: Based on particle size, the soils can be classified as under, adopting the IS soil classification system: 0.002 0.075 0.425 2.36 4.75
Transition Curves: If a vehicle travelling on a straight enters a horizontal curve abruptly, it will cause shock and sway. To avoid this, it is customary to provide a transit
Breast Walls Needed to buttress uphill slopes. Figure : Breast Check Walls Small retaining structures provided in series to arrest landslides. Gabio
Zones of smear around vertical drains Smear zones are produced during the installation of vertical drains in that zone of soils surrounding the band drains are disturbed. Soil
limitations of resistance
Question What is reason of skin reinforcement for deep beams ? Answer In BS8110, it declares that secondary reinforcement have to be provided for beams greater than 750mm deep
Question If construction of concrete carriageway is carried out in summer, be capable of expansion joints be omitted? Answer If construction of concrete carriageway
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd