1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft. The existing ground top of cut elevation (ft) is most nearly:
2. A design engineer commissioned a test pit to determine the top of pipe elevation for a sewer extension project. The existing sewer pipe is an 8-ft o.d. reinforced concrete pipe with wall thickness 10-in. A back sight to a local benchmark with an established elevation of 45.66-ft is obtained with a level and a rod reading of 4.91-ft.
A foresight is taken to a rod resting on the top of pipe with a reading of 12.43-ft.
Calculate The invert elevation (ft) of the sewer pipe.
Explain the Well Drawdown Equations Watch the units, especially if you use log 10 or ln. h 1 = aquifer thickness minus the drawdown (ft) r 1 = distance from well (ft
Test Certificates
Q A transition curve is required for a circular curve of 200-meter Φ radius, the gauge being 1.5 m. and max super elevation restricted to 15 cm. The transition restricted to 15 cm
Types of trusses
How do we get electricity even when the gates of a dam were closed?
Different tape corrections
Question Is it necessary joints of concrete kerbs be in line with joints in concrete carriageway ? Answer In regular practice, joints are provided in road kerbs to ca
how would you perform a rantangular tie ,using an optical square
how to download software
Limitations of trabsmibilty of forces
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd