Calculate the invert elevation of the sewer pipe, Civil Engineering

Assignment Help:

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly:

2. A design engineer commissioned a test pit to determine the top of pipe elevation for a sewer extension project.  The existing sewer pipe is an 8-ft o.d. reinforced concrete pipe with wall thickness 10-in.  A back sight to a local benchmark with an established elevation of 45.66-ft is obtained with a level and a rod reading of 4.91-ft.

 A foresight is taken to a rod resting on the top of pipe with a reading of 12.43-ft.   

Calculate The invert elevation (ft) of the sewer pipe.


Related Discussions:- Calculate the invert elevation of the sewer pipe

Survey, Methods of orientation,Principles of resection

Methods of orientation,Principles of resection

Timber, uses of timber in civil engineering field and its physical state an...

uses of timber in civil engineering field and its physical state and chemical formula or symbol?

Energy equation, find the pressure head at 2-2 if the rate of flow in pipe ...

find the pressure head at 2-2 if the rate of flow in pipe is 0.36m^3/s

Shear lag in typical box-girder bridge, Shear lag in typical box-girder bri...

Shear lag in typical box-girder bridge For multiple-cell box girders, there are normally two arrangements. First one is that independent cells are connected by their top flang

Rcc, difference between RCC and RBC

difference between RCC and RBC

Belt conveyors, Belt Conveyors: Belt conveyors are used for conveying ...

Belt Conveyors: Belt conveyors are used for conveying materials on a continuous basis. The materials usually handled are coal, mineral ores and stone. They are commonly instal

Steel and timber structures, design a tension member subjected to a pull of...

design a tension member subjected to a pull of 300KN using a channel section. the length of a joint available is only 400mm.check the condition of using lug angle for end connecti

Building, What quantity of cement will be needed to lay 2000 blocks of 9 in...

What quantity of cement will be needed to lay 2000 blocks of 9 inches using a mortar ratio of 1:6 with a thickness of 25mm in-between blocks.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd