A 160-HP Diesel engine (peak fuel consumption = 0.04-gal/HP-hr) hydraulic excavator operates on a cycle time of 20 seconds during a 50-min/hr.  During the filling of the bucket cycle, the excavator's engine is at full power for 5-seconds.  The remainder of the time, the engine operates at half-power.  The fuel consumed per hour is most nearly:

Solution:  

Step 1:  Calculate the Time Factor (TF):

Time Factor = 50/60 x 100 = 83.3%

Step 2:  Calculate the Engine Factor (EF):  

Filling the bucket = (5 / 20)  x 1 power = 0.25

Rest of Cycle = (15 / 20) x .50 power = 0.375

                                                 TOTAL   0.625

 Operating Factor = Time Factor x Engine Factor = 0.625 x 0.833 = 0.520  

Step 3:  Calculate the Fuel Consumed  

Fuel consumed/Hr = 0.52 x 160-HP x 0.04-gal/HP-hr = 3.33-gal/hr


Related Discussions:- Calculate the fuel consumed

Timber, uses of timber in civil engineering field and its physical state an...

uses of timber in civil engineering field and its physical state and chemical formula or symbol?

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Concrete cover to enhance fire resistance, Q. Concrete cover to enhance fir...

Q. Concrete cover to enhance fire resistance? In the event of exposing concrete structures to a fire, a temperature gradient is established across the cross section of concrete

Define the thiem equations for confined aquifers, Define the Thiem Equation...

Define the Thiem Equations for Confined Aquifers   Using natural log:  Q = 2ΠKm(h 2 - h 1 )/ln(r 2 /r 1 )      m = aquifer thickness (ft) Using log 10 :   Q = 2Km(h 2 - h

Diagram of distribution pipelines from an overhead tank, Q. There is a colo...

Q. There is a colony having 15 blocks of Type - II quarters, each block having 8 quarters. Make out a diagram of distribution pipelines from an overhead tank and up to the quarters

Size of drainage near roads, how to calculate the size of drainage(box) wid...

how to calculate the size of drainage(box) width and height?

Bolder, what is a bolder?

what is a bolder?

Steel structure, what do mean by outstand element of compression flange, in...

what do mean by outstand element of compression flange, internal element of compression flange and web general

Calculate the amount of import or export, Calculate the Amount of Import or...

Calculate the Amount of Import or Export For the project site shown in Figure, the amount of import or export to bring the entire site to elevation 90-ft is most nearly:

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd