Q. A bridge is to be constructed over a stream having a catchment area = 20 miles2 partly in plains and partly in hills. Portion in hills has a length of 1.7 miles and fall of 880 ft. and that in plains has a length of 5.7 miles and a fall of 244 ft. Calculate the flood discharge if co elf of discharge is 80 % and area factor 95 5 and value of constant for calculating time of concentration = 14 for hills and 6 for plains. One hr rain fall intensity may be assumed as 2.5''.


Related Discussions:- Calculate the flood discharg

Product layout, Product Layout: Imagine a factory manufactures taps, d...

Product Layout: Imagine a factory manufactures taps, drills, reamers and cutters. The production of each of these items needs different machines which may be placed in differe

STRUCTURAL DYNAMICS, Consider a diver weighing 200 Ib at the end of a divin...

Consider a diver weighing 200 Ib at the end of a diving board that cantilevers out 3 ft. The diver oscillates at a frequency of 2 Hz. What is the flexural rigidity E I of the divin

Survey, How to find included angle during partical

How to find included angle during partical

Stone soling - road pavements, Stone Soling: One of the early practic...

Stone Soling: One of the early practices in road construction was to provide a stone soling 150-225 mm in thickness. The stones are laid by manual labour, and stone spalls ar

Grades of concrete, mixing ratio of different type of ready mix concrete.(R...

mixing ratio of different type of ready mix concrete.(RMC)

What do you mean by geotextile filter, Q. What do you mean by Geotextile fi...

Q. What do you mean by Geotextile filter? Geosynthetics is a collective term applied to thin, flexible sheets incorporated in or about soil to enhance its engineering performan

Fy steel, what is the yield stress for reinforcement steel?

what is the yield stress for reinforcement steel?

Explain precedence relationships - construction management, Explain the Pre...

Explain the Precedence Relationships a. Finish-to-Start - the most common, the predecessor activity must finish before the successor activity can start b. Finish to Finish

Functions of cap block drive cap and pile cushion, Question What are ma...

Question What are main functions of cap block drive cap and pile cushion in driven piles? Answer Cap block is fit amid hammer end and drive cap to manage hammer bl

#tiphysics in civil engineering tle.., Ask questapplication of physics in c...

Ask questapplication of physics in civil engineering ion #Minimum 100 words accepted#

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd