Calculate the flood discharg, Civil Engineering

Assignment Help:

Q. A bridge is to be constructed over a stream having a catchment area = 20 miles2 partly in plains and partly in hills. Portion in hills has a length of 1.7 miles and fall of 880 ft. and that in plains has a length of 5.7 miles and a fall of 244 ft. Calculate the flood discharge if co elf of discharge is 80 % and area factor 95 5 and value of constant for calculating time of concentration = 14 for hills and 6 for plains. One hr rain fall intensity may be assumed as 2.5''.


Related Discussions:- Calculate the flood discharg

Vacancy for teaching?, I am a civil engineer and interested to teach.Is the...

I am a civil engineer and interested to teach.Is there any vacancy?

Determine the elastic settlement of a rectangular foundation, Determine the...

Determine the elastic settlement of a rectangular foundation, 6 m × 12 m, on a uniform sand with E = 20,000 kN/m 2 and Poisson's ratio,   = 0.2. The contact pressure is 200 kN/m 2

Calculate the deposited amount - construction management, An engineer depos...

An engineer deposits an "X" amount every 6 months for 3 years so that she'll have $10,000 at the end of this period. The interest rate is 5% per year which is rebalanced every 6-mo

Turbines, How do we get electricity even when the gates of a dam were close...

How do we get electricity even when the gates of a dam were closed?

What is meant by normally consolidated clay stratum, Determine what is mean...

Determine what is meant by normally consolidated clay stratum and over-consolidated clay stratum. Draw typical results of consolidation test data to a suitable plot relating the vo

Corner reinforcement for concrete pavement, Q. Corner reinforcement for con...

Q. Corner reinforcement for concrete pavement? Let's consider a panel of concrete slab without any load transferring devices at it edges. When concrete panel is subjected to tr

Compare the values of active and passive earth pressures, A retaining wall ...

A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo

Linear programming, what are the advantages of linear programming?

what are the advantages of linear programming?

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd