1. 130,000-yd3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%. The final volume of the compacted soil.
2. A 30-ft wide trapezoidal shaped earthen stream diversion channel is cut along a 2-mile stretch of rolling level terrain. The depth of the channel at station 52+25 is 8'-6" deep and at station 53+75 is 12'-6" deep. The bottom of the channel is a constant 12-ft wide and parallel with the surface cut. The volume of excavated material between the referenced stations.
Perimeter of a hexagonal pyramid
Question What is the sucker deck principle for changeable depth bridge decks ? Answer For a variable depth bridge deck, depth of continuous multi-span bridge deck is greate
what is the different kinds of pipes and fittings
CASTE DISCRIMANIMATION
.the assumptions in theory of riveted joints
The ferromagnetic materials loos property at which point? Answer: At Curie point it loos property
In a curved prestressed bridge , how ought to the guided bearings in piers of curved region be oriented with respect to a fixed bearing in abutment?
free body digram
WHAT IS A DISTOMAT ? WRITE A SHORT NOTE ON IT
A nearly horizontal, 12 ft wide rectangular channel carries 60 cfs at a depth of 3.0 ft. The width of the channel is smoothly contracted to 6 ft at the downstream section. (a) Dete
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd