Calculate the elastic stretch of the steel wire rope, Civil Engineering

Assignment Help:

A 70-ft long, ¾" diameter, 6 x 7 FC wire rope is resisting a tension force of 12-kips.  The elastic stretch of the steel wire rope given the following properties is most nearly: E = 10,000-ksi;  A = 0.288-in2

Solution:  The elongation or "stretch" of wire ropes must be considered in designing temporary bracing and lifting configurations.  Elongation comes from two sources: (1) constructional stretch is dependent on the classification and results primarily from a reduction in diameter as load is applied and the strands compact against each other. Constructional stretch is provided by the manufacturer and is always given.  (2) Elastic stretch is caused by deformation of the metal itself when load is applied.  Use the following equation to establish a value for elastic stretch:

Elastic Stretch = PL / AE

Where: P= change in load; L=length; A=area of wire rope; E=modulus of elasticity.

Elastic Stretch = 12-kips x 70-ft x 12-in/ft/ (0.288-in2 *10,000-ksi)  = 3.5-in                              

                          = 3.5-in

 


Related Discussions:- Calculate the elastic stretch of the steel wire rope

Strength of rivet joints, Please help me to write a c program to find stren...

Please help me to write a c program to find strength and efficiency of lap joint, single cover butt joint, double cover butt joint

Stress analysis, • The previous load analysis represents a first and necess...

• The previous load analysis represents a first and necessary step in the analysis of the given structure but it does not tell us whether the given load can be safely supported (i.

Define sulphate attack - underwater inspection of bridge, Define Sulphate A...

Define Sulphate Attack - underwater inspection of bridge? Cement contains a proportion of tricalcium aluminates, which takes part in the hydration process. These can react with

Define the arrow diagramming method, Define the Arrow Diagramming Method ...

Define the Arrow Diagramming Method Activity-on-Arrow (Branch) with nodes as dependencies Uses finish-to-start precedence only. The solution method for an activity on

Air traffic control, Air Traffic Control: Importance of Air Traffic...

Air Traffic Control: Importance of Air Traffic Control Air Traffic Control is a system by which routes for flying aircraft are defined, flight rules are framed, and f

Explain precedence relationships - construction management, Explain the Pre...

Explain the Precedence Relationships a. Finish-to-Start - the most common, the predecessor activity must finish before the successor activity can start b. Finish to Finish

Concrete cracking, Attached information shows construction details of a wat...

Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped

Define the usage of data from hydrographs, Define the usage of Data from Hy...

Define the usage of Data from Hydrographs Flow rates and volume quantities over time. Predictions based on the runoff flow rates. The characteristics of the drainage b

Meaning, i want the meaning of crete

i want the meaning of crete

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd