Calculate the effective annual interest rate, Civil Engineering

Assignment Help:

A credit card advertises a nominal rate of 18% compounded monthly. If no monthly payments are made, the effective annual interest rate is most nearly:

The actual rate is, (18% / 12) = 1.5% per month. The effective annual rate is:

i = (1 + .015)12 - 1 = 0.1956 or 19.56% if you do not pay anything each month.


Related Discussions:- Calculate the effective annual interest rate

Determine the common ways to present the project schedule, Common ways to p...

Common ways to present the project schedule include all except: a. Gantt charts b. Milestone charts c. PERT charts D. Project Network Diagrams with dates added   So

Beam, Classification of beam

Classification of beam

What is the required bracing location for the beam, A contractor has select...

A contractor has selected a W14x74 simply supported beam for a high rise construction project.  The span length for the provided beam is set at 30 feet.  The maximum factored appli

Vertical gradient - geometric design of roads, Vertical Gradient: Ver...

Vertical Gradient: Vertical gradient can be of three types: Ruling Gradient Used as a matter of course. Limiting Gradient Used in situations where site condit

Importance of racking load for a pre-stressed concrete beam, Importance of ...

Importance of racking load for a pre-stressed concrete beam Evaluation of cracking load for a pre-stressed concrete beam member is important for the following cases/reasons.

Project management, Project Management: This unit starts with the gene...

Project Management: This unit starts with the general definition of Project management. Several phases involved in project management are also desribed. Further, the technique

Determine the specific gravity of solids, The Atterberg limits of a clay so...

The Atterberg limits of a clay soil are: Liquid limit = 63%, Plastic limit = 40%, and shrinkage limit = 27%. If a sample of this soil has a volume of 10 cm 3 at the liquid limit a

Explain the term - moderate prestressing, Explain the term - Moderate Prest...

Explain the term - Moderate Prestressing In this form of prestressing, no limit is imposed on  the magnitude of tensile stresses which may be produced in a concrete member unde

Calculate the degree of saturation, A sample of clay taken from a natural s...

A sample of clay taken from a natural stratum was originated to be partially saturated and when tested in the laboratory gave the following results. Calculate the degree of saturat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd