Calculate the deposited amount - construction management, Civil Engineering

Assignment Help:

An engineer deposits an "X" amount every 6 months for 3 years so that she'll have $10,000 at the end of this period. The interest rate is 5% per year which is rebalanced every 6-month.  The amount deposited is most nearly:

Solution:  Determine the components and apply the equation:

n = 6 deposits     i = 2.5% per 6-month period 

F = $10,000(A/F, 2.5%, 6) = 0.15655 A = $1,565.50


Related Discussions:- Calculate the deposited amount - construction management

Determine the stage of cracking moment of pre-stress, Determine the stage o...

Determine the stage of Cracking moment of pre-stress  At the stage of transfer of pre-stress in the pre-stressed beam element, only the pre-stressing force and the self weight

#high way engineering about road pavements.., what is the function of longi...

what is the function of longitudinal joints in concrete road pavements?

Test leakage of constructed gravity pipelines, Question Have air test o...

Question Have air test or water tests be selected to test leakage of constructed gravity pipelines ? Answer For gravity pipes, air tests are carried out after completi

Determine the active thrust on the wall, A retaining wall 9 m high retains ...

A retaining wall 9 m high retains granular fill weighing 18 kN/m 3 with level surface. The active thrust on the wall is 180 kN per metre length of the wall. The height of the wall

What is multiple-cell box girder, Q. What is Multiple-cell box girder? ...

Q. What is Multiple-cell box girder? Multiple-cell box girder: cells connected by top flanges vs. cells connected both by top and bottom flanges When the depth of a box gi

Calculate the energy loss in the piping system, The head (energy) loss in t...

The head (energy) loss in the piping system between points 1 and 7 is the most nearly. Solution: 3 ft. The difference between point 1 and point 7 = 10 ƒt - 7 ƒt = 3 ƒt

WATER SUPPLY, THE DESIGN PERIOD AVERAGE DAILY DEMAND CALCULATE. THE DESIGN ...

THE DESIGN PERIOD AVERAGE DAILY DEMAND CALCULATE. THE DESIGN DEMAND FOR THE WATER RETICULATION OR DISTRIBUTION PERIOD.

Explain census of traffic at level crossings, Q. Explain Census of Traffic ...

Q. Explain Census of Traffic at Level Crossings? Periodical census of traffic at all level crossings, unmanned/manned should be taken at least once in five years to review the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd