Calculate the cycle and production rate , Mechanical Engineering

Assignment Help:

Calculate the Cycle and Production Rate for Single-Machine Robotic Cell

Determine the cycle and production rate for a single-machine robotic cell for an 8-hr shift if the system availability is 85%. Also find out the percent utilization of machine and robot. On average, the machine takes 35 sec. to process a part. The other robot operation times are as follows:

Robot moves the shaft to the lathe                                            1.5 sec

Robot unloads the shaft from the lathe                                       0.5 sec

Robot picks a shaft from the conveyor                                        4.0 sec

Robot loads the shaft onto the lathe                                          1.0 sec

Robot moves the conveyor                                                        1.5 sec

Robot puts the shaft on the outgoing conveyor                            0.5 sec

Robot moves from the output conveyor to the input conveyor        5.0 sec

Description of Solution Approach

The total cycle time of 49 seconds is achieved by adding all of the activities of the robot by including the machining time and other related activities. The production rate is the reciprocal of cycle time. The production rate considering system availability is therefore

Production rate = 1 unit /49 sec. (60 s / min) (60 min / h) (  8 h/ shift) (0.85% uptime)

                       = 500 units per shift

Machine Utilization = Machine cycle time /Total cycle time

                           = 35/49 = 0.7142 or 71.42%

Robot utilization = Robot cycle time /Total cycle time

                        = 14/49 = 0.2857 or 28.57


Related Discussions:- Calculate the cycle and production rate

THERMODYNAMICS, COMPRESSOR MOSTLY USED FOR SUPERHEATING OF IC ENGINES IS CA...

COMPRESSOR MOSTLY USED FOR SUPERHEATING OF IC ENGINES IS CALLED ----------COMPRESSORS

Mockup test, we perform mockup test to 10 tube with tubesheet. please give ...

we perform mockup test to 10 tube with tubesheet. please give the cutting plan?

Sizing a solar pv system, The Rusk's own fairly large house near San Franci...

The Rusk's own fairly large house near San Francisco and the following spreadsheet shows their month to month power use for two years.  1. What is their monthly average power us

Cam, Ask question explin opiz code #Minimum 100 words accepted#

Ask question explin opiz code #Minimum 100 words accepted#

Show geographic constraints of the plant, Q. Show Geographic constraints of...

Q. Show Geographic constraints of the plant? The layout of process units will be influenced by the geographic constraints of the site. Spacing is required between plant facilit

Explain about vessel design loads, Q. Explain about Vessel Design Loads? ...

Q. Explain about Vessel Design Loads? Vessels and their supports shall be designed for all of the following conditions: • Erection: dead weight of fully dressed, empty vesse

Define economics order quantity, a) Define Economics Order Quantity. Derive...

a) Define Economics Order Quantity. Derive, using neat diagram, the mathematical formula for economic order quantity. b) The purchase manager of an industrial unit is placing on

Space time structure, Space Time Structure If the position of the parti...

Space Time Structure If the position of the particle  P  changes, the differential change in its position vector r is, in general, given by, d r = d x  i + d y  j + d z  k

Wire-frame entities-representing ellipse and parabolas, wire-frame entities...

wire-frame entities-representing ellipse and parabolas

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd