Calculate the Cycle and Production Rate for Single-Machine Robotic Cell

Determine the cycle and production rate for a single-machine robotic cell for an 8-hr shift if the system availability is 85%. Also find out the percent utilization of machine and robot. On average, the machine takes 35 sec. to process a part. The other robot operation times are as follows:

Robot moves the shaft to the lathe                                            1.5 sec

Robot unloads the shaft from the lathe                                       0.5 sec

Robot picks a shaft from the conveyor                                        4.0 sec

Robot loads the shaft onto the lathe                                          1.0 sec

Robot moves the conveyor                                                        1.5 sec

Robot puts the shaft on the outgoing conveyor                            0.5 sec

Robot moves from the output conveyor to the input conveyor        5.0 sec

Description of Solution Approach

The total cycle time of 49 seconds is achieved by adding all of the activities of the robot by including the machining time and other related activities. The production rate is the reciprocal of cycle time. The production rate considering system availability is therefore

Production rate = 1 unit /49 sec. (60 s / min) (60 min / h) (  8 h/ shift) (0.85% uptime)

                       = 500 units per shift

Machine Utilization = Machine cycle time /Total cycle time

                           = 35/49 = 0.7142 or 71.42%

Robot utilization = Robot cycle time /Total cycle time

                        = 14/49 = 0.2857 or 28.57


Related Discussions:- Calculate the cycle and production rate

Equiliubrium, Review questions condition of equilibrium grade 11 unit 7

Review questions condition of equilibrium grade 11 unit 7

Friction, law of static friction

law of static friction

Find the maximum shear stress - stepped circular bar, Find the maximum shea...

Find the maximum shear stress - stepped circular bar: A stepped circular bar ABC 4 m long fixed at one of the end 'A' is subjected to a torque of 10 kN-m. If the portion AB is

Processing sequence for manufacturing coupling nut, Processing Sequence for...

Processing Sequence for Manufacturing Coupling Nut Referring to the Figure 12 below, we now illustrate the processing sequence for manufacturing coupling nut.

Explain the objectives of value engineering, OBJECTIVES OF VE: 1. To esta...

OBJECTIVES OF VE: 1. To establishing the monitoring value of the function of the product or services. 2. To identifying unnecessary cost or hidden cost in a product or services.

Determine the deflection under the loads, Determine the deflection under th...

Determine the deflection under the loads: Determine the deflection under the loads as shown in Figure Solution ∑ F y   = 0, so that R A + R B  = 80 + 20 = 100 k

Main factors to be considered when selecting material, Main Factors to be C...

Main Factors to be Considered when Selecting Material The main factors to be considered when selecting a material to meet some specific requirement are: Fitness of use,

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd