Calculate the cycle and production rate , Mechanical Engineering

Assignment Help:

Calculate the Cycle and Production Rate for Single-Machine Robotic Cell

Determine the cycle and production rate for a single-machine robotic cell for an 8-hr shift if the system availability is 85%. Also find out the percent utilization of machine and robot. On average, the machine takes 35 sec. to process a part. The other robot operation times are as follows:

Robot moves the shaft to the lathe                                            1.5 sec

Robot unloads the shaft from the lathe                                       0.5 sec

Robot picks a shaft from the conveyor                                        4.0 sec

Robot loads the shaft onto the lathe                                          1.0 sec

Robot moves the conveyor                                                        1.5 sec

Robot puts the shaft on the outgoing conveyor                            0.5 sec

Robot moves from the output conveyor to the input conveyor        5.0 sec

Description of Solution Approach

The total cycle time of 49 seconds is achieved by adding all of the activities of the robot by including the machining time and other related activities. The production rate is the reciprocal of cycle time. The production rate considering system availability is therefore

Production rate = 1 unit /49 sec. (60 s / min) (60 min / h) (  8 h/ shift) (0.85% uptime)

                       = 500 units per shift

Machine Utilization = Machine cycle time /Total cycle time

                           = 35/49 = 0.7142 or 71.42%

Robot utilization = Robot cycle time /Total cycle time

                        = 14/49 = 0.2857 or 28.57


Related Discussions:- Calculate the cycle and production rate

Estimating time, estimating time of boring, turning,milling?

estimating time of boring, turning,milling?

Annealing temp, hiw can i fix the maximum temp of the aluminium

hiw can i fix the maximum temp of the aluminium

Determine the stress in composite bar, Determine the stress in composite ba...

Determine the stress in composite bar: How do you determine the stress in composite bar? What is Modular Ratio? Sol.: It becomes essential to have a compound tie or strut

Determine the process of modelling, Determine the process of modelling ...

Determine the process of modelling The process of modelling is much easier, if mathematical description of an object, or at least of part of an object may be applied. In the fi

Flux shielded arc welding, FLUX SHIELDED ARC WELDING This process is p...

FLUX SHIELDED ARC WELDING This process is popularly known as Submerged Arc Welding (SAW).This is a fully mechanised welding process. The electrode is a continuous metallic sol

Pattern practices - manufacturing processes, Pattern Practices - Manufactur...

Pattern Practices - Manufacturing processes: Pattern Practices : A pattern may be defined as a replica or fascimile model of the desired casting which, when packed or embedd

Codes and standards for steam generator, Codes and Standards for steam gene...

Codes and Standards for steam generator All equipment purchased, and installation work done, shall be in accordance with the: • Canadian Electrical Code • Alberta Electri

What is the mean of off time, Q.What is the mean of Off time? It is the...

Q.What is the mean of Off time? It is the interval from the end of the hold time to the beginning of the squeeze time for the next (resistance) welding cycle. In automatic m

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd