Calculate the cost to finance the construction project, Civil Engineering

Assignment Help:

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of 14-months. The Contractor secured a bank loan with an interest rate of 1% per month on the outstanding balance. The Contractor will borrow $100,000 per month to reconcile costs at the end of months 1 through 12. Calculate the cost to finance the project that will be included as part of the bid.

Solution: At the end of month 12, the contractor will have borrowed 12 payments of $100,000 each.  The owner is scheduled to pay the contractor at the end of month 14 at which time the contractor will repay the bank.  Use the following equation to calculate the future value then extract the cost of financing the project:  

F = $100,000 (F/A, 1%, 12) (F/P, 1%, 2)   = $1,293,700

                                         Amount Borrowed =$1,200,000

                                    Amount of interest =$     93,700


Related Discussions:- Calculate the cost to finance the construction project

Calculate the percent change in load on the wall form tie, A concrete wall ...

A concrete wall form tie with an ultimate strength capacity of 2,400-lbs is designed for use in a concrete wall form with an 18-in center to center spacing. During formwork inspect

Calculate load distribution factor, Load Distribution Factor: The form...

Load Distribution Factor: The formula for deriving at the number of repetitions of the standard axle load during a design period of n years is: N =365 × A × VDF × F [(1 + r

Define carbonation - underwater inspection of bridge, Define Carbonation - ...

Define Carbonation - underwater inspection of bridge? Carbon dioxide is present in the air and attacks the concrete directly. It has the effect of destroying the normal passivi

Aggregate crushing test, Aggregate Crushing Test: In which the layer o...

Aggregate Crushing Test: In which the layer of aggregates in a cylindrical measure is subjected to a compressive load of 40 T, and the per cent fines generated are determined,

Benchmark, 1. Where permanent bench of india located ? 2. use of Permanent ...

1. Where permanent bench of india located ? 2. use of Permanent BenchMark ?

State the term - relaxation of stress in steel, State the term - Relaxation...

State the term - Relaxation of Stress in Steel If we keep a high-tensile steel wire stretched and maintained at a constant strain, the value of the force in the wire does not

Show the result of vulcanization, Q. Show the result of vulcanization? ...

Q. Show the result of vulcanization? As a result of vulcanization, rubber molecules are cross-linked with sulphur. This cross-linking makes the rubber stronger. It allows the r

Explain the system curves - pumping system, Explain the System Curves - Pum...

Explain the System Curves - Pumping System Non-linear plot beginning on the y-axis at the Total Static Head (TSH) and plotted primarily based on the h f .

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd