Calculate the amount put into saving account, Civil Engineering

Assignment Help:

Calculate the Amount put into Saving Account

If you want to have $60,000 in 10 years, the amount that should be put into a 6.0% (effective annual rate) savings account now is most nearly:

Solution: This problem could also be stated:  What is the equivalent present worth of $60,000 ten years from now if monthly money is worth 6% per year?

P = F (P/F, I, n) = $60,000(P/F, 6%, 10) = $60,000 * 0.5584 = $33,503.69

1018_Calculate the Amount put into Saving Account.png


Related Discussions:- Calculate the amount put into saving account

Important items during level crossing inspection, Q.7.- Write the important...

Q.7.- Write the important items to be inspected during level Crossing inspection. How do you take census of traffic at level crossing. Ans.-Important items to be inspected duri

Mechanics of solid, determine the end slope and deflection in the beam

determine the end slope and deflection in the beam

Determine the project duration and critical path, Critical Path - Activity ...

Critical Path - Activity on Node The project precedence table shown below provides the relationships and durations of all activities. Based on end-of-day calculations for start

Analyse the state of stress at the critical section, Analyse the state of s...

Analyse the state of stress at the critical section: A prismatic bar of circular section with 80 mm diameter is subjected to bending moment of 5 kN-m and a torque of 7 kN-m. A

Define equipments for inspection of steel/cast iron, Define Equipments and ...

Define Equipments and tools for Inspection of Steel/Cast Iron Substructures? To ensure thorough inspection, the area must be cleared of all marine growth. Hand tools such as wi

Verify the optimum value of the spacing of the piles, A 16-pile group has t...

A 16-pile group has to be arranged in the form of a square in soft clay with uniform spacing. Neglecting end-bearing, verify the optimum value of the spacing of the piles in terms

coursework (commercial management), Ask que1. Identify the risks involved ...

Ask que1. Identify the risks involved in this project related to cost in the perspective of the customer and analyse the probability of acceptance of such a project by customers. 2

IRC Class AA loading in existing industrial areas, For IRC Class AA loading...

For IRC Class AA loading in existing industrial areas, what is load (kN/m) has to applied base don the wheel loads. especially raft foundation & roads are at same level.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd