Calculate the amount of import or export, Civil Engineering

Assignment Help:

Calculate the Amount of Import or Export

For the project site shown in Figure, the amount of import or export to bring the entire site to elevation 90-ft is most nearly:

1999_Calculate the amount of import or export.png

Solution:

By inspection, the project has a combination of areas where there are imports and exports to bring the entire site to elevation 90-ft.Further, the multiple choices given for the answer should be analyzed.There is a spread of approximately 20% among the choices which suggests a broad perspective analysis to determine the solution. 

The figures to the right illustrate a broad based analysis.  Assume one grid:

  Existing          90.50-ft

  Proposed        90.00-ft

  Cut                 0.50-ft

  Total Export = [150-ft x 300-ft x 0.50-ft] ÷ 27ft3/yd3 = 833-yd3

 


Related Discussions:- Calculate the amount of import or export

Estimate the size estimating the rcc structures, PART - A 1.  Can you e...

PART - A 1.  Can you enumerate the benefits of individual wall method of estimation? 2.  Estimate the single room of size  3m x 4m x height 3m  using individual wall method?

Convert the azimuth reading of 273.34 to a land bearing, Convert the azimut...

Convert the azimuth reading of 273.34º to a land bearing:  Solution: Convert 273.34º to degrees minutes and seconds = 273º 20' 24" Next, convert the angle to orient to IV

Strength of materials, Didtribution of shear stree over a triangular sectio...

Didtribution of shear stree over a triangular section

Afflux on account of obstruction to flow, Q. Afflux on account of obstructi...

Q. Afflux on account of obstruction to flow? Even if the river constriction on account of approach banks is not excessive and bridge waterway is wider than that causing critica

Differentiate, differentiate between components and resolved parts

differentiate between components and resolved parts

Determine difference between stations in feet and in station, The survey ha...

The survey has identified the beginning and ending points along an urban arterial highway that require new sidewalks. The first station is located at 5+88 and the second station is

Water quality analysis, Water quality analysis: This water quality ana...

Water quality analysis: This water quality analysis presents an overview of physical characteristics of water, chemical substances that are normally present in water and vario

Meaning of driving succession of driven piles, Question What is meaning...

Question What is meaning of driving succession of driven piles? Answer In Basement construction, if piles are driven from centre to perimeter, there is a propensity o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd