A capital improvement project requires the installation of a property line fence along the 250-ft Northern boundary line.The decorative aluminum fence is constructed of posts spaced at 10-ft centers and an ornate picket infill panel. The material costs for this scope of work is most nearly:
Solution: Develop a Bill of Materials and multiply quantities by the costs:
Aluminum Posts: 26 x $645.35 = $16,779.10
Picket Infill Panel 25 x $1,985.50 = $49,637.50
Grand Total $66,416.60
http://www.expertsmind.com/questions/tributary-lateral-load-30133097.aspx
important considerations in case doors and windows
individual wall methods benefits?
what is the bending stress for a simply supported beam with three equal concentrated loads that are equally spaced?
Micro-organism ratio: Determine the F/M ratio (in units of lbs BOD5/lb MLSS-day) using data provided in the above example problem. Solution By definition, F/M = Q S
how to design wet mix
Methods of Constructing Roads in Marshy Areas: The following methods are adopted for constructing roads in marshy areas: (a) Removal of soft soil and replacement with good
WHAT IS PILE CORROSION
in plane table surveying which activity is done first whether centering or levelling?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd