Cad-cam data exchange, Mechanical Engineering

Assignment Help:

CAD-CAM Data Exchange:

The interface SET transferred information on wire-frames, surfaces, B-representation and FEM models as well as technical drawings and scientific data. It features a much more general data structure than IGES. The data is stored in a very compressed form thus the neutral file size is much smaller and processing time is much shorter than for IGES.

VDAFS interface was developed by the German automobile industry for transfer of 3-D curves and surfaces for which IGES offers unsatisfactory solutions.

To improve the deficiencies of IGES, SET and VDAFS interfaces, CAD-1 interface was developed which could directly interact with STEP.

STEP community is the process of defining and standardising a number of domain specific applications. Protocols that shall define neutral files readable by any CAD/CAM systems.

UPR provides data unification where different terms are utilized.


Related Discussions:- Cad-cam data exchange

Replace the two parallel forces by single force, Replace the two parallel f...

Replace the two parallel forces by single force: Replace the two parallel forces acting on the control lever by a single equivalent force R.   Sol.: Since single equ

Describe and calculate humidity ratio, (a) Describe and calculate i) Hum...

(a) Describe and calculate i) Humidity Ratio ii) DPT iii) Relative Humidity iv) Density v) Enthalpy of atmosphere air when DBT is 35 0 C, WBT is 23 0 C and the ba

Spot welding of different metals-low carbon steel, Spot welding of differen...

Spot welding of different metals-Low carbon steel Normally, mild steel can be spot welded from the thinnest gauges to a maximum of two pieces of 12 mm thickness. The restrictio

#totto cycleitle.., for an otto cycle, compression ratio=8.5:1,air inlet=15...

for an otto cycle, compression ratio=8.5:1,air inlet=15degree celsius and pressure=101.3kpa, maximum cycle temperature= 1800degree celsius, what is temperature after compression,te

Prototype sand blast method, During the test run of prototype machine we fo...

During the test run of prototype machine we found out a few issue occurred due to blasting room design problem. The blasting room design is too quartet, this design had cause the b

Minimun work term in reciprocating compressor, what is mean by minimum work...

what is mean by minimum work term in reciprocating compressor?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd