Bund / dike capacity is typically covered by local codes and regulations, however some general principles for liquid storage compounds are:
• The net capacity of a bunded / diked compound in a storage facility must be at least 120% of the net capacity of the largest tank. Take into consideration the capacity displaced by other tanks within the same bunded / diked area and any foundations. Treat interconnected tanks as a single tank of equivalent total volume.
• For flammable liquids, bund / dike capacity should be at least 133% of the net capacity of the largest tank. If an automatic fire sprinkler system is installed in or over any bunded / diked tank or drum storage compound, the capacity of the bund / dike should be increased either by a volume equal to the output from the sprinkler system for a period of at least 20 minutes, or to 133% of the capacity of the largest tank, whichever is greater.
what is the essentials of a good boiler?
Dust Collector: Dust collector system is to collect the blast burrs or waste particle created during the blasting process. During the blasting process, this dust co
what is cloud chamber..
Drainage of the Railway Track: It is necessary to keep the embankment free from water. This is done by providing side ditches, all along the edge of the embankment, and leadi
Diff. B/w edge and screw dislocation
Figure : Front Top View of the Motorcycle Part No. Part Name Functions 1 Turn signal switch Used to give
Spot welding of different metals-Stainless steel Stainless steel is having lower thermal conductivity compared to mild steel. Therefore, it requires less heat input. But, stain
can u please explain me d concept of 2nd law of thermodynamics. I am not so sure about it ??
Q. Radiographic examination of welded joints? Radiographic examination (RT) of welded joints shall be performed as required by the Code. Acceptance criteria shall be in accord
Ask what is hazard and how it is occuring
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd