Q. Briefly explain about Artificial cut offs?
Alignment of a cut off is chosen so that approach and exit ends remain more or less tangential to the river course. A cut off can be made either by open excavation or by means of a dredger. Since considerable amount of work is usually involved below low water level making a cut becomes easier with a dredger.
Normally only a small pilot cut of about 10 per cent capacity of the channel discharge is made where the river cut off is desired. The river is relied upon to open out the pilot cut and develop it once the water starts flowing. When arc to chord ratio is about 5 or more, development of a cut off may be expected to be rapid. A deep and narrow cut may be preferred to a shallow and wide section, since side erosion is easier and faster than bed scour.
Velocities in deeper cut are also more. In designing an artificial pilot cut, its progressive development and final adjustment of the river are required to be visualised. When cut off is made across the neck of the bend, length is shortened so that with the available fall, slope steepens increasing the velocities. These increased velocities open out the cut rapidly and the river gets diverted on the new cut off channel. With increased velocities, bed scour and degradation occurs upstream of the cut off. The scoured material is deposited on the downstream side and finally equilibrium bed and water surface slopes are established which can be a little steeper than the original. Thus in effect river attains a somewhat steeper slope and generates higher velocities. Bank protection is, therefore, usually needed at and in the vicinity of a cut off to prevent side erosion. Otherwise new bends may form in the wake of a cut off as was experienced in the Mississippi River. Superimposition of the expected longitudinal section with cut off over the existing section permits a rough assessment of possible degradation and aggradation. Such an attempt should be made to estimate the final bed and water levels and lengths likely to be affected by the cut off.
Determine the interdependent phases of investigation The following are the interdependent phases of investigation: i) Stratigraphical survey, ii) Physical survey, and
Is there any application by using the third law of thermodynamics. A Actual application without explained the calculation
What are borrow pits?
difference between flat slab and normal slab
describe details about stairs and its type also draw sketch?
Q. Joint continuity influenced by inclined bridge deck? Bearings are generally designed to sit in a horizontal plane so as to avoid the effect of extra horizontal force and une
uses of Earth moving equipment
Calculate the Poissons Ratio: In separate experiments, Young's Modulus and Rigidity Modulus of a material have been determined as 120 GPa and 50 GPa respectively. Calculate th
briefly explain about c tokens ?
Improvements to Public Bus Transport: Since buses carry a large number of passengers, improvements in bus transport is a cheap solution. Some of the possible improvements are
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd