Battery inspection steps, Mechanical Engineering

Assignment Help:

Battery Inspection :  A fully charged and properly maintained battery is essential for proper lighting and starting of the motorcycle.

STEPS

  • Remove the right side cover and inspect the battery.
  • Remove the battery and observe that the electrolyte should be between the 'MAX' and 'MIN' mark given on the battery.
  • If the level is below the 'MIN' mark it should be topped up to the 'MAX' level with distilled water.
  • Check the specific gravity of the battery fluid. Specific gravity is checked with the help of HYDROMETER in each cell of the battery.
  • The specific gravity should be between 1.24 - 1.27.
  • Battery is inspected for voltage by the help of a battery tester or a Multimeter.
  • If the battery is undercharged it should be charged by a battery charger with a charging current of 0.25 A.

 


Related Discussions:- Battery inspection steps

Magnitude of frictional force after perfect rolling begins, What is the mag...

What is the magnitude of frictional force after perfect rolling begins and why? solution) After pure rolling begins,frictional force is 0. This is because the velocity of he c

Optimal feeder geometry, PART A A new process plant for ore processing ...

PART A A new process plant for ore processing is currently being planned. The design is only in the first stage. However, three requirements have already been clearly stated:

Electromagnetic conversion device with example., Q.  In every electromagne...

Q.  In every electromagnetic conversion device, both generator and motor action take place simultaneously. Explain. The case the output is mechanical as in a motoring mode, th

State the main advantage of using master pages, Problem: (a) InDesign ...

Problem: (a) InDesign is known as a common software for designers mainly used for publication of newspapers, magazines and other editorial design artworks. The Master page fe

Explain the importance of jigs and fixtures, Explain the Importance of jigs...

Explain the Importance of jigs and fixtures: Enhance productivity. Rapid production work. Reduces manufacturing costs. Complex and heavy components can be

example of alteration of position and reference line method, Example of Al...

Example of Alteration of Position and Reference Line Method: Sketch the projections of a pentagonal prism edge of the base 50 millimeter long and height 90 millimeter, the axi

Calculate the machine power factor, A 3-phase, 15-kV, 4-pole, cylindrical r...

A 3-phase, 15-kV, 4-pole, cylindrical rotor synchronous generator is connected to a 50-Hz infinite bus. The synchronous reactance of the machine is X s = 0.6 ohms per phase and th

Die press assembly drawing, Die Press Assembly Drawing The objective of...

Die Press Assembly Drawing The objective of this assignment is to demonstrate the following concepts of design. • Extrude • Revolve • Fillet • Dimensioning • Tolerance • Bas

Economic order quantity, Economic Order Quantity: Assume an economic o...

Economic Order Quantity: Assume an economic order quantity case where annual demand D = 500 units, economic order quantity Q = 100 units, the wanted probability of not stockin

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd