Q. Granular fill or rock fill essential at the base of concrete retaining walls?
It isn't uncommon that rock fill layers and granular fill layers are placed beneath the bottom of concrete retaining walls. Purpose of such provision is to spread the loading in view of insufficient bearing capacity of foundation material to maintain the loads of retaining walls.
Upon placing of rockfill layers and granular fill layers, same imposed loads are supported by a larger area of founding material and therefore stress exerted by loads is decreased accordingly.
Layers of rockfill and granular fill materials aren't standard details of concrete retaining wall. If we are fully satisfied that founding material could support the loads arising from retaining walls, it isn't essential to provide these layers of rockfill and granular fill materials.
Lock Entrance: Wet docks have lock entrances to overcome the high fluctuations in water level in the sea. Figure 7 gives a layout of a lock entrance. It consists of a lock cha
earthen dam and gravity dam
A square pile group of 9 piles of 25 cm diameter is arranged with a pile spacing of 1m. The length of the piles is 9 m. Unit cohesion of the clay is 75 kN/m 2 . Neglecting beari
Q. What do you mean by Manhole loss? Manholes are provided in locations where there are changes in direction, size and gradient of gravity pipelines. Generally practice for str
I need a drawing detail of expansion joints in building and different sizes
how to carry on leveling using dumpy level????????????
Using Laplace transfom, the following differential equation d y dy dt reduces to the algebraic equation of the form Resolve y(s) into partial fractions
Ask question laws of sollid friction #Minimum 100 words accepted#
Q. Define water content, void ratio and dry density of a soil. If wet density of a soil is 1.9 gm per cm at a moisture content of 24%, what will be its dry density? Ans. - W
Calculate the Benefit-Cost Analysis Ratio A city engineer is deciding which of two alternatives to select. If the interest rate is 10% per year, the Benefit-Cost analysis rat
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd