b. A paper mill produces two grades of paper viz., X and Y. , Operation Research

Assignment Help:
b. A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper in a week. There are 160 production hours in a week. It requires 0.20 and 0.40 hours to produce a ton of grade X and Y papers. The mill earns a profit of Rs. 200 and Rs. 500 per ton of grade X and Y paper respectively. Formulate this as a Linear Programming Problem.

Related Discussions:- b. A paper mill produces two grades of paper viz., X and Y.

Stratified sample size - sampling size, Stratified Sample Size The  sa...

Stratified Sample Size The  sampling  study  has depended  much on the stratified sample  to reduce  the sampling  error, samples  size may have a number of strata or  cluster

Determine capacity of unit, Show simple vapour compression Refrigeration cy...

Show simple vapour compression Refrigeration cycle with showing all the devices and also draw T-sand P-R diagram and illustrate it also. A Bell-Coleman cycle works between 1 bar

LINEAR PROGRAMMING, A paper mill produces two grades of paper viz., X and Y...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

LInear Programming, - A paper mill produces two grades of paper viz., X an...

- A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y pape

#title.sum., a company produces 150 cars. but the production rate varies wi...

a company produces 150 cars. but the production rate varies with the distribution.

Cgj, application&techniques

application&techniques

Line balancing, what will happen when line balance doesn not exist

what will happen when line balance doesn not exist

LPP, USE SIMPLE METHOD TO SOLVE THE FOLLOWING LPP MAXIMISE Z=4X1+10X2 SUBJE...

USE SIMPLE METHOD TO SOLVE THE FOLLOWING LPP MAXIMISE Z=4X1+10X2 SUBJECT TO CONSTRAINS, 2X1+X2 2X1+5X2 2X1+3X2 X1, X2>0

LPP using Simple method, Maximize Z= 3x1 + 2X2 Subject to the constraints: ...

Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Quartiles, QUARTILES The three points on the scale  of observation ( o...

QUARTILES The three points on the scale  of observation ( or  values  of the variable) which  divide  the total  frequency  into four  equal  parts are called  quartiles for t

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd