Autocad, Civil Engineering

Assignment Help:
pls explain about this field

Related Discussions:- Autocad

Explain in detail about textural classification, Explain in detail about  ...

Explain in detail about  Textural classification. Sketch neatly the Casagrande's plasticity chart indicating several aspects. How would you use it in classifying the fine graine

Cement, manufacture of cement by dry process

manufacture of cement by dry process

Embankment, Describe the various steps in embankment construction.

Describe the various steps in embankment construction.

Explain the signalized intersections - transportation, Explain the Signaliz...

Explain the Signalized Intersections Cycle length - the time required for one complete sequence of all signal indications Phase - the right-of-way (green), change (yellow),

Explain the variable conditions of river flow - bridges, Explain the Variab...

Explain the Variable Conditions of River Flow and Health State? The variable conditions of river flow and health state of structure demands constant supervision.  Although scou

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Casing has to be left in for mini-piles, Question What are thought in d...

Question What are thought in determining whether casings have to be left in for mini-piles ? Answer Contrary to most of pile design, design of min-piles is controlled

Nonsymmetrical loading of the snow, Nonsymmetrical loading of the snow ...

Nonsymmetrical loading of the snow A decrease in snow weight in some parts of a roof because of the wind, or melting from the heath, or the sun light would reduce internal powe

Engineering economics, Ask quA contractor has both a 3-cy and a 5-cy shovel...

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 worki

Earth work in high embankments, Q. Earth work in high embankments? (a) ...

Q. Earth work in high embankments? (a) Borrow pits must not be dug close to telegraph poles, electric poles, level crossings, bridges a culverts, or within 800 meters of the bo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd