assignment 2012, Operation Research

Assignment Help:
Problem 1 (Problem 23, page 507) At a machine tool plant, five jobs must be completed
each day. The time it takes to do each job depends on the machine used to do the job. If a
machine is used at all, there is a setup time required. The relevant times are given in Table
20. The companys goal is to minimize the sum of the setup and machine operation times
needed to complete all jobs. Formulate and solve (with LINGO) an integer programming
problem whose solution will do this.
i''m not sure how to start the variables and constraints or how to write it into a lingo program

Related Discussions:- assignment 2012

Linear programming problem, A paper mill produces two grades of paper viz.,...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

LINEAR PROGRAMMING, A DRUG MANUFACTURER produces 2 products X1 and X2.X1 ne...

A DRUG MANUFACTURER produces 2 products X1 and X2.X1 needs 2 hours on machine A AND 2 HOURS ON MACHINE B.X2 needs 3 hours on machine A and 1 hour on machine B.If machine A can run

Uses of mode - measure of central tendency, Uses of Mode The  use of t...

Uses of Mode The  use of the mode is recommended in the following  situations: a.When a quick  and approximate measures of  central tendency desired. b.When the  measure

Ge, Ask question #Minimum 100 words what can engineer planner do in métallu...

Ask question #Minimum 100 words what can engineer planner do in métallurgie accepted#

Meaning of research report - report writing presentation, Meaning of Resear...

Meaning of Research Report Research  report is the process of communicating  the  results  of an investigation it  is a document which  reflect about  the research conducted a

Find the maximum and minimum values, Problems based on solution of a given ...

Problems based on solution of a given LPP when it has multiple optimal solution: 1.    Find the maximum and minimum values of 5x+2y, subject to the constraints -2x-3y ≤ -6

Network models, These models are applied to the management ( planning con...

These models are applied to the management ( planning controlling and scheduling ) of large scale projects. PERT/ CPM techniques help in identifying potential trouble spots in

Students t distribution - hypothesis testing, Normal 0 false ...

Normal 0 false false false EN-IN X-NONE X-NONE

Linear programming model, formulate the linear programming model of the tab...

formulate the linear programming model of the table above

Mk, Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = ...

Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Write Your Message!

Captcha
Free Assignment Quote