Asphalt mix design – durability and stability, Civil Engineering

Assignment Help:

Q. Asphalt mix design - durability vs. stability?

The main aim of asphalt mix design is to achieve a mix with economical blending of aggregates with asphalt to achieve the following: 

(i) Workability to facilitate easy placement of bituminous materials without experiencing segregation;

(ii) Sufficient stability so that under traffic loads the pavement won't undergo distortion and displacement

(iii) Durability by having sufficient asphalt

(iv)  Sufficient air voids

In asphalt mix design, high durability is generally attained at the expense of low stability. Therefore a balance has to be stricken between durability and stability requirements.


Related Discussions:- Asphalt mix design – durability and stability

Axial flow pumps for large flows and low heads, Q. Axial flow pumps for lar...

Q. Axial flow pumps for large flows and low heads? It is well known that axial flow pumps are the most suitable for providing large flows and low heads. Reason behind this is c

Surveying, what are the basic two division of surveying

what are the basic two division of surveying

Define the cracking - underwater inspection of bridge, Define the Cracking ...

Define the Cracking - underwater inspection of bridge? A crack is a linear fracture in concrete. There can be several types of cracks starting from surface and going into the c

Benefits of analysis of prestress and bending stresses, Normal 0 ...

Normal 0 false false false EN-IN X-NONE X-NONE

Estimate the size estimating the rcc structures, PART - A 1.  Can you e...

PART - A 1.  Can you enumerate the benefits of individual wall method of estimation? 2.  Estimate the single room of size  3m x 4m x height 3m  using individual wall method?

Compaction, describe how quality control is maintained in a rolled fill dam...

describe how quality control is maintained in a rolled fill dam

Direct levelling, to find height difference between two or more points in d...

to find height difference between two or more points in different conditions

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Determine the settlement of the foundation, The thiclcness of the normally...

The thiclcness of the normally consolidated soft clay layer is 6 m. The natural water content is 31 percent. The specific gravity of the soil being 2.68 with a liquid limit of 4

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd