Asphalt mix design – durability and stability, Civil Engineering

Assignment Help:

Q. Asphalt mix design - durability vs. stability?

The main aim of asphalt mix design is to achieve a mix with economical blending of aggregates with asphalt to achieve the following: 

(i) Workability to facilitate easy placement of bituminous materials without experiencing segregation;

(ii) Sufficient stability so that under traffic loads the pavement won't undergo distortion and displacement

(iii) Durability by having sufficient asphalt

(iv)  Sufficient air voids

In asphalt mix design, high durability is generally attained at the expense of low stability. Therefore a balance has to be stricken between durability and stability requirements.


Related Discussions:- Asphalt mix design – durability and stability

Chemistry, scale and sludge formation in boilears

scale and sludge formation in boilears

Leveling., what is the errors faced in leveling

what is the errors faced in leveling

Concrete, types of concrete and its uses

types of concrete and its uses

What is codal provisions, According to National Building Code (Sp:7 1970), ...

According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful dist

Define the phreatic line and phreatic zone, Define the Phreatic Line and Ph...

Define the Phreatic Line and Phreatic Zone Phreatic Line: In an unconfined aquifer, it represents the water table.   Phreatic Zone: In an unconfined aquifer, it is located b

Calculate the cost to finance the construction project, A contractor is bid...

A contractor is bidding a construction project that will take 12 months to complete. The terms of the bid provide that the owner will pay the Contractor one lump sum at the end of

Increasing concrete cover beyond contractual, Question If contractor sugges...

Question If contractor suggests increasing concrete cover beyond contractual such as 40mm to 70mm shall engineers accept suggestion? Answer In contractual part, based on requir

Engg surveying, what does mean by too short and too long in erroneous tape ...

what does mean by too short and too long in erroneous tape length?

Surveing, what is importance of positioning in different types of engineeri...

what is importance of positioning in different types of engineering?

Semi elliptical arch, how can i build a semi-elliptical arch out of bricks?...

how can i build a semi-elliptical arch out of bricks?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd