Asic based new product development project, Electrical Engineering

Assignment Help:

Assume you are working for an SME operating in the microelectronics sector. You are required to plan a new product development project. This is an internal project, so it does not generate any income during the development phase.

The product will be ASIC based and will be sold in fairly high volumes - about 50,000 units/month when sales become established.

Initial considerations indicate that the product will comprise the following:

  • a small plastic base and a plastic cover that clips to the base.
  • a small LCD that will be capable of displaying simple alphanumeric data, which will mount inside the cover.
  • a double sided PCB populated by surface mount components.
  • a simple "keyboard" using 6 keys, to be mounted on the front of the case cover.
  • an ASIC that will have about 12 pins. The ASIC will be die bonded and wire bonded to the PCB.

Requirements

Product development plan in Microsoft Project

The project plan should be commented in detail using the task notes facility within MSP. Produce a calendar and resource pool for the project: remember an SME will not employ many development engineers. The project should be fully costed so appropriate costs should be assigned to the project resources.


Project risk log and risk reduction strategies

ASIC risks should be included as well as risks associated with other tasks. Where appropriate, low cost strategies for reducing risk should be suggested.


Structured meetings directory

This will include an outline meeting agenda, an outline meeting minutes document and an outline action list.

Short report providing an overview of the proposal

This will explain the rationale behind your proposal and items of particular interest, such as the project risk log and risk reduction strategies. State any assumptions you make, for example about the resources available for the project.

Where appropriate the rationale associated with the activities, the development plan, the structured meetings directory, the proposal overview and the project implementation should be included.

The report should be structured, i.e. sections, diagrams and tables should be numbered. There should be a title page and a table of contents.

Project Implementation and Review

When you are satisfied with project plan, you should create a project baseline and start the project on the planned start date. This should be completed at the end of week 7. Note that you may subsequently change your project plan if you wish.

From week 8 onwards you should record project progress on selected tasks in the MSP plan on a weekly basis. Be sure to save the MSP project plan when you do this each week. In this way, you should end up with a series of 5 or more sets of files from earlier weeks which will be valuable later when it comes to undertaking the project review.


Related Discussions:- Asic based new product development project

Find out the low-frequency voltage gain, Design a differential amplifier wi...

Design a differential amplifier with active current mirror load in Cadence using TSMC 0.35 micron process. The power supply voltage is 3.3V. A 10µA current reference is available

Explain multimedia extensions technology, Explain MMX Technology. Mult...

Explain MMX Technology. Multimedia extensions technology adds 57 newly instructions to the instruction set of the Pentium - 4 microprocessors. The Multimedia extensions techno

Grid connected hybrid pv-wind power system, Hi there, My project title is g...

Hi there, My project title is grid connected hybrid pv-wind power system. For this topic, i need a specification of the system. For this system a matlab and homer software simulati

D flip-flop - latch or delay element, Q. D flip-flop - latch or delay eleme...

Q. D flip-flop - latch or delay element? The symbol for the clocked D flip-flop is shown in Figure (a), in which the two output terminals Q and ¯ Q behave just as in the SRFF,

Explain steady-state error of linear systems, Q. Explain Steady-State Error...

Q. Explain Steady-State Error of Linear Systems? If the steady-state response of the output does not agree exactly with the steady state of the input, the system is said to hav

Test, current and voltage

current and voltage

find the thevenin and norton equivalent circuits, The output port of the o...

The output port of the one-port is defined by terminals A and B. Given: R 1 = 10 k_, R 2 = 20 k_, R 3 = 10 k_, and R 4 = 10 k_ V 1 = 20 V and I1 = 0.8 mA a) Find the T

Illumination, Ask question #Minimum 100A light assembly shop, 15 m long, 9 ...

Ask question #Minimum 100A light assembly shop, 15 m long, 9 m wide and 3 m up to trusses is to illuminated to a level of 200 lux. The utilization and maintenance factors are resp

Determine the signal to noise ratio, Your manager has requested you to revi...

Your manager has requested you to review current techniques for reducing, or eliminating, the effects of external interference upon electronic circuits. He requires a short report

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd