Arrangement of piles in a pile cap to reduce bending moment, Civil Engineering

Assignment Help:

Arrangement of piles in a pile cap to reduce bending moment induced in piles

Let's consider that piles are designed to intersect at a single common point in a pile cap. The resultant reactions will pass through the point of intersection in pile cap. This kind of arrangement doesn't involve any bending moment induced if horizontal loads pass through this point. Though in real life situation, piling system is expected to resist a combination of vertical loads, horizontal loads and bending moment. To counteract bending moment, pile cap about the point of intersection is rotated so that substantial amount of bending moment is persuaded in piles and pure axial forces in piles can barelyproduce a counteracting moment based on one single intersection point. 

Though if the piles are arranged in such a way that there are at least two separated points of intersection in pile cap, amount of flexural stresses persuaded in piles is significantly decreased. 

180_Arrangement of piles in a pile cap to reduce bending moment.png

Fig: Different arrangement of piles in pile cap


Related Discussions:- Arrangement of piles in a pile cap to reduce bending moment

Wet mix Macadam, Test required before laying or after laying.

Test required before laying or after laying.

Strength of rivet joints, Please help me to write a c program to find stren...

Please help me to write a c program to find strength and efficiency of lap joint, single cover butt joint, double cover butt joint

Steady flow energy equation, If there is steady flow, nothing changes with ...

If there is steady flow, nothing changes with time.  1. The properties of the fluid at entry and exit are constant. 2.  The properties of the fluid at any point in the contro

Estimation of loading carrying capacity, Question While designing mini...

Question While designing mini-piles , should strength of grout be disused during estimation of loading carrying capacity? Answer While designing min-piles, there will

Factors determining the stability of a single armour unit, Q. Factors deter...

Q. Factors determining the stability of a single armour unit There are mostly three major factors that govern the stability of an armour unit, viz gravity, intertangling and s

How the bursting tensile forces produced, How the Bursting Tensile Forces p...

How the Bursting Tensile Forces produced These are tensile forces produced due to concentrated longitudinally applied prestressing forces in the end zone of a post-tensioned co

Premix carpet - road pavements, Premix Carpet: An open graded premix ...

Premix Carpet: An open graded premix carpet, commonly called premix carpet (PC), is an open graded premixed material laid to a thickness of 20 mm and rolled, followed by a se

Strength of materials, distribution of shear stress in triangular section

distribution of shear stress in triangular section

Construction of embankment, Construction of Embankment: The following...

Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed

What is diversion tunnel in a dam, When a dam is to be built, a diversion t...

When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd