Question-Why is span length ratio of end span, approach span to its neighbouring inner spans typically about 0.75?
Answer-From aesthetic point of view, odd number of spans with reduce in length in direction of abutment is desirable. In addition, spans of equal length are found to be tedious. However, an arrangement of irregular span lengths is not recommended since it gives a feeling of disquiet.
From structural point of view, for a multi-span bridge with alike span length, sagging moment at mid-span of the end span, approach span is largest. In order to cut this moment, span length of an end span, approach span is designing to be 0.75 of inner spans. However, ratio should not be less than 0.40 because of effect of uplifting at end span, come close to span support.
Explain Hydrology and Evaporation Hydrology: Study of the circulation of water in nature. Evaporation: Water in the liquid state transforms to vapor. Evaporation occurs f
What is the rate of application of Prime coat over WBM
Question What are major ways to undertake negative skin friction ? Answer (i) Utilize slender pile sections since smaller pile area when subject to same working load
hi sir. i hope every thing is fine with you. I want to have an information about the way how to compute stream flow from the rainfall over the catchment and anso need the way how t
Q. What is Sedimentation tank ? This is a process in which the water is passed through bases or tanks in which the velocity of water is so reduced or water is given a period of
Q. Permanent Repairs to rail fracture? (i) If the fracture is such that, wide gap A T welding ban be adopted, then the total length of fractured ends to-be cut shall be equal t
Strength: The strength of aggregates is determined from one of the three tests : Aggregate Impact Test In which the aggregates in a mould are subjected to impact caus
Stone Soling: One of the early practices in road construction was to provide a stone soling 150-225 mm in thickness. The stones are laid by manual labour, and stone spalls ar
Q. What are the causes of settlement? The various causes of settlement are: 1) increasing load on the surrounding soil deposit, 2) excavation, 3) lowering of water tab
study of cross staff
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd