Application of embankment condition for drainage design, Civil Engineering

Assignment Help:

Q. Application of embankment condition for drainage design?

In considering loads on buried pipeline, there are generally two scenarios: narrow trench condition and embankment (wide trench) condition.

For narrow trench condition, when pipe is laid in a comparatively narrow trench with backfill properly compacted, weight of fill is jointly supported by both the pipe and frictional forces along the trench walls. For embankment condition, fill directly above settles less than fill on the side. Thus loads are transferred to the pipeline and loads on pipeline are in excess of that because of the fill on pipeline. 

The narrow trench condition is used where excavation begins from the natural ground surface without any fills above the surface. On the contrary, embankment condition applies where the pipes are laid at the base of fill. For example embankment condition is generally adopted where the pipes are laid partly in trench or partly in fill or poor foundations to pipes are encountered so that trenches have to be excavated wider than the minimum requirement.


Related Discussions:- Application of embankment condition for drainage design

Airport management, Airport Management: Airlines (a)        Adequ...

Airport Management: Airlines (a)        Adequate space for each airline for ticketting, check-in and baggage handling, and (b)       Adequate space for airline staff.

List the factor that affect the permeability of a given soil, List the fact...

List the factors that affect the permeability of a given soil. Determine the precautions that should be taken so that satisfactory permeability data may be obtained. Explaining

Passenger conveyors, Passenger Conveyors: Passenger conveyors are used...

Passenger Conveyors: Passenger conveyors are used at locations where a large concentration of passengers has to be moved from one place to another. Escalators are used to conv

Explain pressure balance method and compressed air method, Pressure balance...

Pressure balance method vs. compressed air method in pipe jacking Pressure balance method generally requires the use of mechanically operated tunnel-boring machine at its cutti

Varignon''s Theorem, What is the easiest way to give proof the varignon''s ...

What is the easiest way to give proof the varignon''s theorem? Help please guys

Determine the common ways to present the project schedule, Common ways to p...

Common ways to present the project schedule include all except: a. Gantt charts b. Milestone charts c. PERT charts D. Project Network Diagrams with dates added   So

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd