Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Application of embankment condition for drainage design?
In considering loads on buried pipeline, there are generally two scenarios: narrow trench condition and embankment (wide trench) condition.
For narrow trench condition, when pipe is laid in a comparatively narrow trench with backfill properly compacted, weight of fill is jointly supported by both the pipe and frictional forces along the trench walls. For embankment condition, fill directly above settles less than fill on the side. Thus loads are transferred to the pipeline and loads on pipeline are in excess of that because of the fill on pipeline.
The narrow trench condition is used where excavation begins from the natural ground surface without any fills above the surface. On the contrary, embankment condition applies where the pipes are laid at the base of fill. For example embankment condition is generally adopted where the pipes are laid partly in trench or partly in fill or poor foundations to pipes are encountered so that trenches have to be excavated wider than the minimum requirement.
Define Equipments and tools for Inspection of Steel/Cast Iron Substructures? To ensure thorough inspection, the area must be cleared of all marine growth. Hand tools such as wi
Q. Explain Plate loading test? In general iron plates either 60 cm squares or 75 cm dia and 16 mm thick are used, size of plate should not be less then 1/5th of the width of f
curing of brick masonry
Define NPDES Sampling Requirements? The sampling needs under NPDES are given at 40 CFR Part 122, as part of the needs for applying for an NPDES discharge allow. The needs are b
basic concept of traffic study
define of couple
What practical steps can one take to mitigate the adverse effects in using aggregates with higher than specified flakiness index in the production of concrete
Ask question #Minimum 100 words accepted2812539076# you
difference between BM and BC in black topping
A flitched beam consists of a wooden joist 150 mm wide and 300 mm deep strengthened by steel plates 12 mm thick and 300 mm deep one on either side of the joist. If the maximum st
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd