ABC Company manufactures both interior and exterior paints from 2 raw materials M1 and M2. The following table gives basic data of problem.
Exterior paint
Interior paint
Availability
N1
6
4
24
N2
1
2
Profit per ton
5
A market survey signifies that every day demand for interior paint cannot surpass that for exterior paint by more than 1 ton. Also maximum routine demand for interior paint is 2 tons. Develop LPP to find out the top product mix of interior and exterior paints that maximizes the daily total gain (profit).
Answer
Assume
x1 - number of units of exterior paint
x2 - number of units of interior paint
Maximize Z = 5x1 + 4x2
Subject to
6x1 + 4x2 ≤ 24
x1 + 2x2 ≤ 6
x2 - x1≤ 1
x2≤ 2
x1≥0, x2 ≥0
b) The highest routine demand for exterior paint is almost 2.5 tons
x1≤ 2.5
c) Routine demand for interior paint is as a minimum 2 tons
x2 ≥ 2
d) Routine demand for interior paint is accurately 1 ton more than that for exterior paint.
x2 > x1 + 1
Data and Information: The term "data" (plural form of datum) refers to "an individual fact, statistic, or a piece of information or a group or a body of facts, statistics or t
explaination
Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment
explian completelly the operation reserch
Case Study - Research Design RJR Nabisco Ever since the health aspects of smoking became a public issue shortly after world war II the tobacco industry knew there
how does it work
a company produces 150 cars. but the production rate varies with the distribution.
Use Big M method to Maximize(Z)=3_(x_1 )+2_(x_2 ) Subject to 3_(x_1 )+?1.5?_(x_2 )=30 x_1+x_2=20 x_1=0 x_2=0
#use the simple method to solve the following L.P.P. Maximize Z =4X1 +10X2 subject to constraints, 2X1 +X2 2X1+5X2 2X1 +3X2 X1,X2 > 0
Usage in the Context of Library and Information Services: In library and information science, there is, however, no need for making such distinction between data and informati
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd