ABC Company manufactures both interior and exterior paints from 2 raw materials M1 and M2. The following table gives basic data of problem.

 

 

Exterior paint

Interior paint

Availability

N1

6

4

24

N2

1

2

6

Profit per ton

5

4

 

A market survey signifies that every day demand for interior paint cannot surpass that for exterior paint by more than 1 ton. Also maximum routine demand for interior paint is 2 tons. Develop LPP to find out the top product mix of interior and exterior paints that maximizes the daily total gain (profit).

Answer

Assume

 x1 - number of units of exterior paint

      x2 - number of units of interior paint

 

Maximize Z = 5x1 + 4x2         

Subject to

6x1 + 4x2 ≤ 24

x1 + 2x2 ≤ 6

x2 - x1≤ 1

x2≤ 2

                 x1≥0, x2 ≥0

 

b) The highest routine demand for exterior paint is almost 2.5 tons

                 x1≤ 2.5

c) Routine demand for interior paint is as a minimum 2 tons

                 x2 ≥ 2

d) Routine demand for interior paint is accurately 1 ton more than that for exterior paint.

                 x2 > x1 + 1

 

 

 


Related Discussions:- Answering lp problems

Operation Research, A paper mill produces two grades of paper viz., X and Y...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Linear programming, Meaning of Linear programming problem and explanation o...

Meaning of Linear programming problem and explanation of graphical method of solving Linear Programming Problem

Techniques of work measurement, Techniques  of Work  Measurement A n...

Techniques  of Work  Measurement A number of work  measurement  techniques  have been  developed  to suit  different  types of work . There are: 1. Repetitive work: The

Linear programming, Q3. Solve the following Linear Programming Problem usi...

Q3. Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

Linear programming solution by steps for two-phase method, Solve by Steps f...

Solve by Steps for Two-Phase Method Max Z = 5x 1 + 8x 2 Subject to 3x 1 + 2x 2 ≥ 3 x 1 + 4x 2 ≥ 4 x 1 + x 2 ≤ 5     &     x 1 ≥ 0, x 2  ≥ 0 Answe

Categorizing operations research problems, what are the categorization of o...

what are the categorization of operations research problems?

Equation, A paper mill produces two grades of paper viz., X and Y. Because ...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Vogel approximation methods, This method is more  systematic and orderly th...

This method is more  systematic and orderly than least cost method. Here penalties for each column and row of the transportation table are determined, and the row  or  column with

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd