Answering lp problems, Operation Research

Assignment Help:

ABC Company manufactures both interior and exterior paints from 2 raw materials M1 and M2. The following table gives basic data of problem.

 

 

Exterior paint

Interior paint

Availability

N1

6

4

24

N2

1

2

6

Profit per ton

5

4

 

A market survey signifies that every day demand for interior paint cannot surpass that for exterior paint by more than 1 ton. Also maximum routine demand for interior paint is 2 tons. Develop LPP to find out the top product mix of interior and exterior paints that maximizes the daily total gain (profit).

Answer

Assume

 x1 - number of units of exterior paint

      x2 - number of units of interior paint

 

Maximize Z = 5x1 + 4x2         

Subject to

6x1 + 4x2 ≤ 24

x1 + 2x2 ≤ 6

x2 - x1≤ 1

x2≤ 2

                 x1≥0, x2 ≥0

 

b) The highest routine demand for exterior paint is almost 2.5 tons

                 x1≤ 2.5

c) Routine demand for interior paint is as a minimum 2 tons

                 x2 ≥ 2

d) Routine demand for interior paint is accurately 1 ton more than that for exterior paint.

                 x2 > x1 + 1

 

 

 


Related Discussions:- Answering lp problems

Solved a.q, Solve the following Linear Programming Problem using Simple met...

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

I need answer for the below question, A paper mill produces two grades of p...

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Graphical method- minimization example, Minimization Example  A ...

Minimization Example  A farmer is advised to utilize at least 900 kg of mineral A and 1200 kg of mineral B to increase the productivity of crops in his fields.

Linear programming., Q3. Solve the following Linear Programming Problem usi...

Q3. Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 4 X

Linear programing, Maximize6x1+8x2+5x3,st,labour3x1+4x2+5x3 =0 then brefly ...

Maximize6x1+8x2+5x3,st,labour3x1+4x2+5x3 =0 then brefly explain x1,x2,x3;term labour,metal&plastic;the160hours;x1,x2&x3>=0

Tables and graphs, Normal 0 false false false EN-IN ...

Normal 0 false false false EN-IN X-NONE X-NONE

What do you understand by the term operations research, Question : (a) ...

Question : (a) (i) What do you understand by the term "operations research"? (ii) Discuss three common operations research models. (b) Self-service at the university c

Operations research, What are artificial variable why do you need them

What are artificial variable why do you need them

Preparation of script - report writing presentation , Preparation of Script...

Preparation of Script   The most  tedious  and arduous takes is  the  preparation of the  script. While  you have  all the ideas and  points  will should  stored  up in the  mi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd