Answering lp problems, Operation Research

Assignment Help:

ABC Company manufactures both interior and exterior paints from 2 raw materials M1 and M2. The following table gives basic data of problem.

 

 

Exterior paint

Interior paint

Availability

N1

6

4

24

N2

1

2

6

Profit per ton

5

4

 

A market survey signifies that every day demand for interior paint cannot surpass that for exterior paint by more than 1 ton. Also maximum routine demand for interior paint is 2 tons. Develop LPP to find out the top product mix of interior and exterior paints that maximizes the daily total gain (profit).

Answer

Assume

 x1 - number of units of exterior paint

      x2 - number of units of interior paint

 

Maximize Z = 5x1 + 4x2         

Subject to

6x1 + 4x2 ≤ 24

x1 + 2x2 ≤ 6

x2 - x1≤ 1

x2≤ 2

                 x1≥0, x2 ≥0

 

b) The highest routine demand for exterior paint is almost 2.5 tons

                 x1≤ 2.5

c) Routine demand for interior paint is as a minimum 2 tons

                 x2 ≥ 2

d) Routine demand for interior paint is accurately 1 ton more than that for exterior paint.

                 x2 > x1 + 1

 

 

 


Related Discussions:- Answering lp problems

Replacement theory.., a pipe lis dur for rpair,the repair would cost 10000 ...

a pipe lis dur for rpair,the repair would cost 10000 and it would last for 3 years.alternatively a new pipe line can be purchase at 30000 for 10 years.assuming 10% depriciation rat

Simple size -sampling decisions, simple Size When a survey  is underta...

simple Size When a survey  is undertaken and  it is not  possible  to cover  the entire population, the marketing  researcher has to  answer a basic  question  - how  large  s

Operation Research, A paper mill produces two grades of paper viz., X & Y. ...

A paper mill produces two grades of paper viz., X & Y. Because of raw material restrictions, it cannot produce more 400 tons of grade X paper & 300 tons of grade Y paper in a week.

Quality circles, advantage of quality circle process

advantage of quality circle process

Demerits of range - measure of dispersion , Demerits  of Range a.It g...

Demerits  of Range a.It gives  importance  to the  two  extreme  values and is very much affected by the extreme items. b.The range  provides  no information  about the  st

#, Six Operators are to be assigned to five jobs with the cost of assignmen...

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

#title.industry, scope of operation research in insutry and defence

scope of operation research in insutry and defence

Duality, For every LP formulation there exists another unique linear ...

For every LP formulation there exists another unique linear programming formulation called the 'Dual' (the original formulation is called the 'Primal'). Same data

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd