Analysis the production in manufacturing company, Project Management

Assignment Help:

Analysis

The factory has the process for the following:  QC of sampling,  receiving orders,  receiving fabrics and accessories,  checking of fabrics,  drawing,  cutting,  sorting,  sewing, pressing,  quality Control,  packing and delivery.  

414_Analysis.png

As the factory was originally designed for in-house production, it has some problems in adjusting the processes according to the new and demanding requirements.  Further it was also noted that the factory is completely lacking proper planning and scheduling of all the activities.  There are bottlenecks in resource allocation for various process units.  For example, the unit need to go to the regular production unit for fixing accessories and for pressing for sampling processes. This, not only delays the sampling unit, but also interrupts the regular production processes.  Sewing accessories has to be interrupted and machines have to be re-adjusted for sampling to meet the current regular production processes.

357_Analysis1.png

Comparing the problems with theory and practical processes.

Need to discuss on standard production planning and the difficulties in adopting the standard practices.  The factory needs to verify the standard garments production time using standard process time.  It requires reviewing the resources allocated at various processes and readjusting the resource requirements.  For example, it is possible to reduce the ideal time in adjusting the machines that are doing regular production by increasing one more worker and introducing one more sewing machine for the sampling unit.


Related Discussions:- Analysis the production in manufacturing company

Tolerance and surface finish, Tolerance and Surface Finish Design engi...

Tolerance and Surface Finish Design engineers are always blamed of specifying closer tolerances than necessary. It  is obvious that to achieve a tolerance of ± 0.001 mm is mor

Decision analysis, how to perform decision tree analysis for case study of ...

how to perform decision tree analysis for case study of transformation replacement..

Describe the product and service, 1. Which product /service you propose to ...

1. Which product /service you propose to work on this quarter? From which company? Which product category does it belong to? Describe the product/service you will market briefly.

Performance measurement - elements of tqm, Performance measurement: Pe...

Performance measurement: Performance measurement needs to be based upontimely measures of, and feedback on, performance. It provides information ontoday's service and gives an

Discuss the fundamental differences between qa and qc, Discuss the fundamen...

Discuss the fundamental differences between QA and QC and give examples of usage of each methodology - The notions of QC (Quality control) and QA (Quality Assurance) are deeme

Electronic document delivery systems, Electronic Document Delivery Systems:...

Electronic Document Delivery Systems: The systems employing electronic technology for the receipt of requests and supply of documents are known as Electronic Document Delivery

Strategy for project implementation, A strategy for project implementation ...

A strategy for project implementation Projects involving  small number  of  activities,  resources,  constraints  and inter-relationship can be visualized easily by the human m

Advantages and disadvantages of a matrix project structure, C Consultancy C...

C Consultancy Company gives management consultancy to a range of organisations.  It employs staff who have dissimilar industry backgrounds and who also offer dissimilar specialisms

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd