Alluvial Streams:

In alluvial streams, the regime width of a river is calculated from the Lacey's formula :

W = 4.8 Q½

where  W = Regime width in m, and

Q = Discharge in cu m per sec.

The waterway is kept equal to the regime width.


Related Discussions:- Alluvial streams

Pcc, Specific Gravity & Water Absorption of Fine Aggregate

Specific Gravity & Water Absorption of Fine Aggregate

Determine the common ways to present the project schedule, Common ways to p...

Common ways to present the project schedule include all except: a. Gantt charts b. Milestone charts c. PERT charts D. Project Network Diagrams with dates added   So

Determine the loss in post-tensioned members, Determine the Loss in post-te...

Determine the Loss in post-tensioned members This loss occurs only in post-tensioned members. There always exists a certain amount of friction in the jacking and anchoring syst

Test on specially moulded test piece, Test on specially moulded test piece ...

Test on specially moulded test piece The test piece shall be moulded by the manufacturer with identical compound and under identical vulcanizing conditions as used in manufact

Cone, if the diameter of the base remains constant by what factor should th...

if the diameter of the base remains constant by what factor should the altitude be multiplied to produce a cone with twice volume as the original

Manhole covers – triangular halves, Manhole covers - triangular halves ...

Manhole covers - triangular halves Manhole covers are usually made up of two pieces of triangular plates to form a square cover. One can wonder why two rectangular halves are u

Determine the load which a square footing, Two load tests were performed at...

Two load tests were performed at a site-one with a 50 cm square plate and the other with a 75 cm square plate. For a settlement of 15 mm, the loads were recorded as 50 kN and 90 kN

Construction of concrete carriageway, Question If construction of conc...

Question If construction of concrete carriageway is carried out in summer, be capable of expansion joints be omitted? Answer If construction of concrete carriageway

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd