Advantages of unbonded post-tensioning systems, Civil Engineering

Assignment Help:

Advantages of unbonded post-tensioning systems

Similarly, some advantages of unbonded post-tensioning systems over bonded post-tensioning ones may be written as under :

 (a) The ability to individually adjust cables based on poor field conditions (For example: shifting a group of four cables around an opening by placing two to either side).

(b) The procedure of post-stress grouting is eliminated.

(c) The ability to de-stress the tendons before attempting repair work.

 


Related Discussions:- Advantages of unbonded post-tensioning systems

Tests on limestones, Tests on Limestones Practical tests are made on li...

Tests on Limestones Practical tests are made on lime stones to decide their suitability is following:     i.       Physical tests    ii.        Heat test    iii.

Deformation equation for settlement, Q. Deformation Equation for settlement...

Q. Deformation Equation for settlement? When a load is applied on an elastic body, it results in strain. The summation of strain over a length is deformation or settlement. In

Fixed and pinned connection between piles and pile caps, Q. Fixed vs pinned...

Q. Fixed vs pinned connection between piles and pile caps? The type of connection amid piles and pile caps affects the load carrying capacity of pile groups. Fixity of pile hea

Cross drainage work, Cross Drainage Work: Several natural streams, ri...

Cross Drainage Work: Several natural streams, rivers and canals cross the road. They have to be led across the road through culverts and bridges. That given structures is kno

Of obstacles to both chaining and ranging.., #questof obstacles to both cha...

#questof obstacles to both chaining and ranging. ion..

Define pressure on an inclined plane, Define Pressure on an Inclined Plane ...

Define Pressure on an Inclined Plane Similar to a vertical plane, fluid pressure increases linearly with increasing depth. The average pressure on an inclined plane occurs at t

Water quality analysis, Water quality analysis: This water quality ana...

Water quality analysis: This water quality analysis presents an overview of physical characteristics of water, chemical substances that are normally present in water and vario

Explain the secondary treatment for wastewater, Explain the Secondary treat...

Explain the Secondary treatment for wastewater Secondary Treatment: to remove soluble BOD that escapes the primary treatment and to provide added removal of suspended solids.

Determine the coordinate for point r, For the project work points (x,y) sho...

For the project work points (x,y) shown in the figure the bearing of point R is due West. The coordinate for point R is most nearly:    Solution: Determine the length o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd